WELL · 42-131-38085 · DISTRICT 4

Weil #2

Plugged

Duval County · Sarnosa West field  · Vertical

Weil #2 (API 42-131-38085) is a plugged well in Duval County, plugged July 3, 1998, last operated by Bronco Z Production.

The RRC has issued one drilling permit, issued April 1, 1996, permitted to 3,500 ft.

It was permitted by El Dorado Resources Inc. and has since transferred to Bronco Z Production on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Bronco Z Production

Permitted by EL Dorado Resources Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Jan 5, 1998 · 12 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBronco Z Production
Production reportsBay Rock Operating Companythrough Dec 1997
Latest permitEL Dorado Resources Inc.Apr 1, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Apr 1, 1996
last permit issued
Aug 29, 1996
completed
0
cumulative oil, bbl
39.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1996 THROUGH Jul 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 29, 1996
Shut in
—
Plugged
Jul 3, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Weil G-4-160001Sarnosa, WestBronco Z Production1039.2KAug 1996 – Jul 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Dorado Resources Inc.Aug 1996 → May 1997
  2. 2Bay Rock Operating CompanyDec 1997 → Dec 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446549-99DrillEL Dorado Resources Inc.Apr 1, 1996Apr 1, 1996Apr 4, 19963,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-160001————

Formation tops

As filed on W-2/G-1. Subsea from 580 ft elevation.Download CSV →

FormationMD ftSubsea
Frio1,214-634

Perforations

Perforated and open-hole intervals.

FromToType
1,2121,224Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535812.25185 S
4.52,5807.875505 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 1996Sep 16, 1996Yes
00Oct 4, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138085, documented in the API reference.