WELL · 42-131-38269 · DISTRICT 4
Cuellar 123 #2
Duval County · SVD (Yegua E) field · Vertical
Cuellar 123 #2 (API 42-131-38269) is a plugged well in Duval County, plugged September 20, 2001, last operated by Sanchez Oil & Gas Corporation.
The RRC has issued 2 drilling permits between 1998 and 1999, permitted to 6,000 ft.
Completion filings report 7 formation tops, including Cole, Argo, U. Gov'T Wells, Mirando.
Operator of record
Houston, TX · P-5 Y, filed Feb 4, 2026 · 541 permits on file · (956) 722-8092
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sanchez Oil & Gas Corporation |
| Production reports | Sanchez Oil & Gas Corporationthrough Apr 1999 |
| Latest permit | Sanchez Oil & Gas CorporationApr 19, 1999 |
- 6,000
- total depth, ft
- 2
- permits on file
- Apr 19, 1999
- last permit issued
- Mar 11, 2000
- completed
- 0
- cumulative oil, bbl
- 163K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1998 THROUGH Sep 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 11, 2000
- Shut in
- —
- Plugged
- Sep 20, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cuellar 123 G-4-169626 | SVD (Yegua E) | Sanchez Oil & Gas Corporation | 1 | 0 | 163K | Jul 1998 – Sep 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sanchez Oil & Gas CorporationJul 1998 → Apr 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 483954-99 | Field transfer | Sanchez Oil & Gas Corporation | Apr 19, 1999 | Apr 19, 1999 | Jun 24, 1998 | 5,000 |
| 476801-99 | Drill | Sanchez Oil & Gas Corporation | Jun 2, 1998 | Jun 2, 1998 | Jun 24, 1998 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-169626 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 661 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cole | 2,029 | -1,368 |
| Argo | 2,560 | -1,899 |
| U. Gov't Wells | 2,685 | -2,024 |
| Mirando | 2,933 | -2,272 |
| Pettus A | 3,121 | -2,460 |
| Pettusa | 3,121 | -2,460 |
| Pettus E | 3,458 | -2,797 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,186 | 3,205 | Perforated |
| 3,458 | 3,463 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 733 | 12.25 | 345 S |
| 5.5 | 3,581 | 7.875 | 380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 9, 2000 | Apr 3, 2000 | — |
| 00 | Sep 22, 1999 | Apr 2, 1999 | — |
| 00 | Sep 22, 1998 | Aug 24, 1998 | Yes |
| 00 | Sep 8, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-38269 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-38269 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 89.7K
- bbl, last 12 reported months
- 124K
- bbl, all reported
- Jan 2002
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000089294 | W-14 Disposal | Plugged Oct 26, 2001 | 2,500 | 1,550 | 3,186–3,205 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 89,672 · prior 12 34,491(+160%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13138269, documented in the API reference.