WELL · 42-131-38507 · DISTRICT 4
Bazan #4
Duval County · Sejita East (1800) field · Vertical
Bazan #4 (API 42-131-38507) is a plugged well in Duval County, plugged January 26, 2010, last operated by Trinity Gas Corporation.
The RRC has issued 3 drilling permits between 2001 and 2005, permitted to 2,150 ft.
Operator of record
Enid, OK · P-5 Y, filed Aug 4, 2025 · 38 permits on file · (405) 659-9565
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trinity Gas Corporation |
| Production reports | Trinity Gas Corporationthrough Apr 2009 |
| Latest permit | Trinity Gas CorporationJul 18, 2005 |
- 2,150
- total depth, ft
- 3
- permits on file
- Jul 18, 2005
- last permit issued
- Dec 3, 2001
- completed
- 0
- cumulative oil, bbl
- 323K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2001 THROUGH Jan 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 3, 2001
- Shut in
- —
- Plugged
- Jan 26, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bazan G-4-211225 | Sejita, East (1300) | Trinity Gas Corporation | 1 | 0 | 165K | Jul 2005 – Jan 2010 |
| Bazan G-4-188874 | Sejita, East (1600) | Trinity Gas Corporation | 1 | 0 | 142K | Apr 2002 – Jun 2005 |
| Bazan G-4-186784 | Sejita, East (1800) | Trinity Gas Corporation | 1 | 0 | 15.9K | Dec 2001 – Apr 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trinity Gas CorporationDec 2001 → Apr 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603443-99 | Recompletion | Trinity Gas Corporation | Jul 14, 2005 | Jul 18, 2005 | Jun 30, 2005 | 1,658 |
| 519141-99 | Recompletion | Trinity Gas Corporation | Apr 16, 2002 | Apr 23, 2002 | Apr 9, 2002 | 1,770 |
| 509057-99 | Drill | Trinity Gas Corporation | May 16, 2001 | Jun 12, 2001 | Oct 23, 2001 | 2,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-186784 | — | — | — | — |
| — | — G-4-188874 | — | — | — | — |
| — | — G-4-211225 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,234 | 1,238 | Perforated |
| 1,604 | 1,610 | Perforated |
| 1,872 | 1,876 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 998 | 12.25 | 333 S |
| 8.625 | 999 | 12.25 | 333 S |
| 5.5 | 1,983 | 7.875 | 330 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 20, 2005 | Jul 29, 2005 | Yes |
| 00 | Oct 5, 2005 | — | — |
| 00 | Jul 8, 2002 | May 10, 2002 | Yes |
| 00 | Jun 7, 2002 | — | — |
| 00 | Feb 26, 2002 | Dec 17, 2001 | Yes |
| 00 | Feb 8, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-38507 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-38507 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13138507, documented in the API reference.