WELL · 42-131-38508 · DISTRICT 4
Casey Jack #17
Duval County · Sejita East (1800) field · Vertical
Casey Jack #17 (API 42-131-38508) is a plugged well in Duval County, plugged January 15, 2007, last operated by Trinity Gas Corporation.
The RRC has issued 2 drilling permits between 2001 and 2006, permitted to 2,150 ft.
Completion filings report 3 formation tops, including 1200 Sand, 1600 Sand, 1800 Sand.
Operator of record
Enid, OK · P-5 Y, filed Aug 4, 2025 · 38 permits on file · (405) 659-9565
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trinity Gas Corporation |
| Production reports | Trinity Gas Corporationthrough Oct 2006 |
| Latest permit | Trinity Gas CorporationAug 8, 2006 |
- 2,150
- total depth, ft
- 2
- permits on file
- Aug 8, 2006
- last permit issued
- Nov 13, 2001
- completed
- 0
- cumulative oil, bbl
- 299K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2001 THROUGH Jan 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 13, 2001
- Shut in
- —
- Plugged
- Jan 15, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Casey, Jack G-4-221723 | Sejita, East (1300) | Trinity Gas Corporation | 1 | 0 | 6.41K | Jul 2006 – Jan 2007 |
| Casey, Jack G-4-186056 | Sejita, East (1800) | Trinity Gas Corporation | 1 | 0 | 293K | Nov 2001 – Jul 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trinity Gas CorporationDec 2001 → Oct 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 623607-99 | Recompletion | Trinity Gas Corporation | Jul 31, 2006 | Aug 8, 2006 | Jul 25, 2006 | 2,000 |
| 509045-99 | Drill | Trinity Gas Corporation | May 16, 2001 | Jul 26, 2001 | Oct 18, 2001 | 2,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-186056 | — | — | — | — |
| — | — G-4-221723 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 361 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 1200 Sand | 1,222 | -861 |
| 1600 Sand | 1,645 | -1,284 |
| 1800 Sand | 1,834 | -1,473 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,201 | 1,203 | Perforated |
| 1,834 | 1,844 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 998 | 12.25 | 365 S |
| 8.625 | 999 | 12.25 | 365 S |
| 5.5 | 2,000 | 7.875 | 470 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 19, 2007 | Aug 21, 2006 | Yes |
| 00 | Nov 20, 2006 | — | — |
| 00 | Jan 14, 2002 | Dec 5, 2001 | Yes |
| 00 | Dec 28, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-38508 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-38508 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13138508, documented in the API reference.