WELL · 42-131-38674 · DISTRICT 4
Barfield #1
Duval County · Vertical
Barfield #1 (API 42-131-38674) is a permitted well in Duval County filed by Blackbird Oil & Gas, LLC.; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 2003 and 2008, permitted to 7,800 ft.
Completion filings report 5 formation tops, including Government Wells, Pettus, Cook Mountain, Crocket.
Its lease has reported 4.82K barrels of oil since June 2003, last reporting in July 2026.
Operator of record
San Antonio, TX · P-5 Y, filed Jul 7, 2017 · 11 permits on file · (877) 890-9168
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Micro Operating, Inc.through Nov 2023 |
| Latest permit | Blackbird Oil & Gas, LLC.Oct 27, 2008 |
- 7,800
- total depth, ft
- 3
- permits on file
- Oct 27, 2008
- last permit issued
- —
- completed
- 4.82K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barfield O-4-13260 | EL Mesquite (5000) | RBT Oil Group, LLC | 1 | 4.82K | 0 | Jun 2003 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Royal Production Company, Inc.Mar 2004 → Aug 2005
- 2Riddle Engineering Corp.Sep 2005 → Aug 2006
- 3Dakota Oil CompanySep 2006 → Sep 2008
- 4Blackbird Oil & Gas, LLC.Nov 2008 → Jul 2011
- 5Teal Energy USA, Inc.Apr 2019 → Apr 2019
- 6Micro Operating, Inc.Jul 2023 → Nov 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 673661-99 | Recompletion | Blackbird Oil & Gas, LLC. | Oct 22, 2008 | Oct 27, 2008 | — | 7,652 |
| 539496-98 | Drill | Royal Production Company, Inc. | Mar 18, 2004 | Dec 9, 2003 | — | 7,800 |
| 539496-99 | Drill | Royal Production Company, Inc. | Dec 9, 2003 | Dec 9, 2003 | — | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-13260 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 615 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Government Wells | 3,165 | -2,550 |
| Pettus | 3,750 | -3,135 |
| Cook Mountain | 5,395 | -4,780 |
| Crocket | 5,565 | -4,950 |
| Queen City | 7,385 | -6,770 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,404 | 5,408 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,885 | 12.25 | 575 S |
| 4.5 | 8,050 | 8.75 | 1,010 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 6, 2005 | Aug 24, 2004 | Yes |
| 00 | Nov 16, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-38674 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-38674 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13138674, documented in the API reference.