WELL · 42-131-38697 · DISTRICT 4

Bravo Land Company #2

Y

Duval County · Bravo (Wilcox a ) field · Temp Abandoned  · Vertical

Bravo Land Company #2 (API 42-131-38697) is a well in Duval County operated by Proline Energy Resources Inc, completed February 26, 2010 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 2004 and 2010, permitted to 10,500 ft.

It was permitted by Chroma Operating, Inc. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.

Completion filings report 4 formation tops, including Yegua, Sparta, Queen City, Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Proline Energy Resources Inc

Permitted by Chroma Operating, Inc.; the EWA schedule now lists a different operator.

Sugar Land, TX · P-5 Y, filed Jul 4, 2026 · (832) 930-4455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProline Energy Resources Inc
Production reportsWhite Oak Operating Company LLCthrough Dec 2015
Latest permitChroma Operating, Inc.Jul 21, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
3
permits on file
Jul 21, 2010
last permit issued
Feb 26, 2010
completed
0
cumulative oil, bbl
1.24M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 26, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bravo Land Company G-4-204579Bravo (Wilcox 9750)Proline Energy Resources Inc10844KSep 2004 – Jul 2026
Bravo Land Company G-4-256652Bravo (Wilcox "A")Proline Energy Resources Inc10400KFeb 2010 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Swift Energy CompanySep 2004 → Nov 2005
  2. 2White Oak Operating Company LLCDec 2005 → Dec 2015
  3. 3Chroma Operating, Inc.May 2008 → Nov 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
698442-99RecompletionChroma Operating, Inc.Jul 1, 2010Jul 21, 2010Feb 11, 20109,898
544951-98DrillSwift Energy CompanyDec 7, 2004May 20, 2004Jun 22, 20049,898
544951-99DrillSwift Energy CompanyApr 26, 2004May 20, 2004—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-204579————
—— G-4-256652————

Formation tops

As filed on W-2/G-1. Subsea from 599 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua2,770-2,171
Sparta3,170-2,571
Queen City3,680-3,081
WilcoxWILCOX A9,652-9,053
WilcoxWILCOX B9,688-9,089
WilcoxWILCOX C9,754-9,155

Perforations

Perforated and open-hole intervals.

FromToType
9,6569,660Perforated
9,6969,706Perforated
9,6969,725Perforated
9,7209,725Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,02713760 S
79,4058.8751,510 S
3.59,740——
3.59,8986.3751,285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 30, 2010May 24, 2010Yes
00Jul 28, 2010——
00Jun 14, 2007Jun 7, 2007—
00Feb 15, 2005Oct 27, 2004Yes
00Dec 13, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138697, documented in the API reference.