WELL · 42-131-38745 · DISTRICT 4
Killam #1
Duval County · Peters (Wilcox D-2) field · Vertical
Killam #1 (API 42-131-38745) is a plugged well in Duval County, plugged March 27, 2012, last operated by Killam Oil CO. Ltd..
The RRC has issued one drilling permit (amended once), issued October 5, 2004, permitted to 12,000 ft.
It was permitted by Zinke & Trumbo, Inc. and has since transferred to Killam Oil CO. Ltd. on the wellbore schedule.
Operator of record
Permitted by Zinke & Trumbo, Inc.; the EWA schedule now lists a different operator.
Laredo, TX · P-5 Y, filed Feb 4, 2026 · 837 permits on file · (956) 724-7141
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Killam Oil Co. Ltd. |
| Production reports | Killam Oil Co., Ltd.through May 2009 |
| Latest permit | Zinke & Trumbo, Inc.Oct 5, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 2
- permits on file
- Oct 5, 2004
- last permit issued
- Apr 23, 2009
- completed
- 0
- cumulative oil, bbl
- 865K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2005 THROUGH Mar 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 23, 2009
- Shut in
- —
- Plugged
- Mar 27, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Killam G-4-210340 | Peters (Wilcox D-2) | Killam Oil Co., Ltd. | 1 | 0 | 865K | Feb 2005 – Mar 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Zinke & Trumbo, Inc.Feb 2005 → Mar 2006
- 2Zenergy, Inc.Apr 2006 → Jun 2008
- 3Killam Oil Co., Ltd.Aug 2008 → May 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 551876-98 | Drill | Zinke & Trumbo, Inc. | Jul 18, 2005 | Oct 5, 2004 | Dec 13, 2004 | 12,000 |
| 551876-99 | Drill | Zinke & Trumbo, Inc. | Oct 4, 2004 | Oct 5, 2004 | — | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-210340 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,015 | 10,030 | Perforated |
| 10,306 | 10,314 | Perforated |
| 10,330 | 10,332 | Perforated |
| 10,338 | 10,342 | Perforated |
| 10,400 | 10,410 | Perforated |
| 10,400 | 10,428 | Perforated |
| 10,410 | 10,419 | Perforated |
| 10,419 | 10,428 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,985 | 12.25 | 710 S |
| 7 | 9,001 | 8.75 | 385 S |
| 4.5 | 11,957 | 6.125 | 295 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 18, 2009 | May 11, 2009 | — |
| 00 | Nov 13, 2007 | Sep 21, 2007 | — |
| 00 | Mar 28, 2007 | Aug 30, 2006 | — |
| 00 | Sep 25, 2006 | Feb 17, 2006 | — |
| 00 | May 26, 2006 | Nov 4, 2005 | — |
| 00 | Nov 2, 2005 | Jun 23, 2005 | Yes |
| 00 | Sep 1, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-38745 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-38745 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13138745, documented in the API reference.