WELL · 42-131-38800 · DISTRICT 4

Wernecke B #2

Plugged

Duval County · Rosita (Wilcox P) field  · Vertical

Wernecke B #2 (API 42-131-38800) is a plugged well in Duval County, plugged April 14, 2023, last operated by Wagner Oil Company.

The RRC has issued one drilling permit (amended once), issued May 3, 2005, permitted to 10,600 ft.

It was permitted by Ascent Operating, LP and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Operator of record

Wagner Oil Company

Permitted by Ascent Operating, LP; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 278 permits on file · (800) 457-5332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsHalcon Resources Operating, Inc.through May 2013
Latest permitAscent Operating, LPMay 3, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
2
permits on file
May 3, 2005
last permit issued
Jun 17, 2005
completed
0
cumulative oil, bbl
194K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2005 THROUGH Apr 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 17, 2005
Shut in
—
Plugged
Apr 14, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wernecke "B" G-4-210521Rosita (Wilcox P)Wagner Oil Company10194KJun 2005 – Apr 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ascent Operating, LPJun 2005 → Aug 2008
  2. 2Roc Operating, Inc.Sep 2008 → Oct 2008
  3. 3Ram Operating Company, Inc.Nov 2008 → Apr 2012
  4. 4Halcon Resources Operating, Inc.Sep 2012 → May 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
600106-98DrillAscent Operating, LPJul 11, 2005May 3, 2005May 11, 200510,600
600106-99DrillAscent Operating, LPMay 3, 2005May 3, 2005—10,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-210521————

Formation tops

As filed on W-2/G-1. Subsea from 568 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxTOP WILCOX P SAND9,660-9,092

Perforations

Perforated and open-hole intervals.

FromToType
9,7709,805Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,20514.751,711 S
7.6258,4009.875355 S
4.510,3256.75395 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 7, 2006Jul 14, 2005Yes
00Sep 12, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13138800, documented in the API reference.