WELL · 42-131-39149 · DISTRICT 4
Atchison #1
Duval County · Rancho Solo (Wilcox F-1) field · Directional
Atchison #1 (API 42-131-39149) is a plugged well in Duval County, plugged May 17, 2011, last operated by U.S. Enercorp Ltd..
The RRC has issued one drilling permit (amended twice), issued February 24, 2009, permitted to 14,600 ft.
Completion filings report 2 formation tops, including Queen City, Wilcox.
Operator of record
San Antonio, TX · P-5 Y, filed Apr 3, 2020 · 102 permits on file · (877) 349-5459
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | U.S. Enercorp Ltd. |
| Production reports | U.S. Enercorp, Ltd.through Jul 2010 |
| Latest permit | U.S. Enercorp, Ltd.May 15, 2009 |
- 14,600
- total depth, ft
- 3
- permits on file
- May 15, 2009
- last permit issued
- Mar 1, 2010
- completed
- 0
- cumulative oil, bbl
- 73.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH May 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 1, 2010
- Shut in
- —
- Plugged
- May 17, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Atchison G-4-254201 | Rancho Solo (Wilcox F-1) | U.S. Enercorp, Ltd. | 1 | 0 | 73.3K | Jul 2009 – May 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1U.S. Enercorp, Ltd.Sep 2009 → Jul 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 678776-97 | Drill | U.S. Enercorp, Ltd. | Oct 23, 2009 | May 15, 2009 | Mar 2, 2009 | 14,371 |
| 678776-98 | Drill | U.S. Enercorp, Ltd. | May 8, 2009 | Feb 24, 2009 | — | 14,600 |
| 678776-99 | Drill | U.S. Enercorp, Ltd. | Feb 20, 2009 | Feb 24, 2009 | — | 14,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-254201 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 701 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 6,153 | -5,452 |
| WilcoxWILCOX HINNANT | 9,838 | -9,137 |
| WilcoxWILCOX HINNANT SANDS | 9,838 | -9,137 |
| WilcoxWILCOX F-1 | 12,930 | -12,229 |
| WilcoxWILCOX F SERIES | 12,930 | -12,229 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,940 | 12,966 | Perforated |
| 13,191 | 13,227 | Perforated |
| 13,246 | 13,284 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,243 | 17.5 | 1,390 S |
| 9.625 | 8,400 | 12.25 | 450 S |
| 4.5 | 14,495 | 6.5 | 235 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 20, 2010 | Apr 26, 2010 | — |
| 00 | Jul 5, 2010 | Apr 14, 2010 | — |
| 00 | Mar 30, 2010 | Nov 2, 2009 | Yes |
| 00 | Jan 27, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-39149 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-39149 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13139149, documented in the API reference.