WELL · 42-131-39254 · DISTRICT 4
Anita #1
Duval County · Martin Ranch (Yegua 7200) field · Vertical
Anita #1 (API 42-131-39254) is a plugged well in Duval County, plugged July 3, 2018, last operated by Xog Operating LLC.
The RRC has issued 2 drilling permits between 2011 and 2014, permitted to 7,300 ft.
Completion filings report 4 formation tops, including Hockey (Upper), Hockley (Upper), Pettus, Yegua.
Its 3 leases have reported 6.55K barrels of oil and 80.8K mcf of gas since January 2012, last reporting in October 2018. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Oct 4, 2025 · 137 permits on file · (432) 425-0869
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XOG Operating LLC |
| Production reports | XOG Operating LLCthrough Sep 2015 |
| Latest permit | XOG Operating LLCApr 18, 2014 |
- 7,300
- total depth, ft
- 2
- permits on file
- Apr 18, 2014
- last permit issued
- Dec 14, 2012
- completed
- 6.55K
- cumulative oil, bbl
- 80.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Oct 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 14, 2012
- Shut in
- —
- Plugged
- Jul 3, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anita O-4-13825 | Martin Ranch (Yegua 7200) | XOG Operating LLC | 1 | 6.55K | 16.4K | Sep 2012 – Oct 2018 |
| Anita G-4-275530 | Martin Ranch (Yegua 6650) | XOG Operating LLC | 1 | 0 | 16.5K | Apr 2014 – Jul 2018 |
| Anita G-4-266808 | Martin Ranch (Yegua 7200) | XOG Operating LLC | 1 | 0 | 48K | Jan 2012 – Jan 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XOG Operating LLCJan 2012 → Sep 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 783760-99 | Recompletion | XOG Operating LLC | Apr 2, 2014 | Apr 18, 2014 | Apr 7, 2014 | 7,300 |
| 726849-99 | Drill | XOG Operating LLC | Oct 24, 2011 | Oct 26, 2011 | Dec 12, 2011 | 7,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-266808 | — | — | — | — |
| — | — G-4-275530 | — | — | — | — |
| — | — O-4-13825 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,462 | 6,466 | Perforated |
| 6,791 | 6,797 | Perforated |
| 7,130 | 7,134 | Perforated |
| 7,148 | 7,160 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,051 | 12.25 | 335 S |
| 4.5 | 7,330 | 7.875 | 765 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 26, 2015 | Jun 30, 2014 | Yes |
| 00 | Jun 27, 2014 | Dec 31, 2013 | Yes |
| 00 | Dec 31, 2013 | Jan 9, 2013 | — |
| 00 | Mar 26, 2013 | Feb 7, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-39254 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-39254 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13139254, documented in the API reference.