WELL · 42-131-39300 · DISTRICT 4

Killam 257 #21

Y

Duval County · Lundell field · Injection  · Vertical

Killam 257 #21 (API 42-131-39300) is a well in Duval County operated by Killam Oil CO. Ltd., completed April 28, 2023 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 15, 2012, permitted to 4,000 ft.

Completion filings report 4 formation tops, including Cole, Mirando, Rosenberg, Rosenburg.

Its lease has reported 249K barrels of oil since May 1995, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 757K barrels injected in the 12 months reported through October 2025.

Operator of record

Killam Oil Co. Ltd.

Laredo, TX · P-5 Y, filed Feb 4, 2026 · 837 permits on file · (956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsKillam Oil Co., Ltd.through Apr 2026
Latest permitKillam Oil Co., Ltd.Jun 15, 2012
4,000
total depth, ft
1
permits on file
Jun 15, 2012
last permit issued
Apr 28, 2023
completed
249K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 28, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Killam "257" O-4-12458LundellKillam Oil Co., Ltd.8249K0May 1995 – Jul 2026

Oil, barrels lease total

Last 12 months 2,713 · prior 12 2,974(-9%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Killam Oil Co., Ltd.May 1995 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
742287-99DrillKillam Oil Co., Ltd.Jun 6, 2012Jun 15, 2012Nov 10, 20124,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-12458————

Formation tops

As filed on W-2/G-1. Subsea from 717 ft elevation.Download CSV →

FormationMD ftSubsea
Cole1,630-913
Mirando2,454-1,737
Rosenberg2,912-2,195
Rosenburg2,912-2,195

Perforations

Perforated and open-hole intervals.

FromToType
1,6841,696Perforated
1,7161,736Perforated
2,5202,540Perforated
3,3213,334Perforated
3,4963,508Perforated
3,4963,520Perforated
3,5083,520Perforated
3,8053,815Perforated
3,8053,835Perforated
3,8153,835Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551612.25200 S
5.54,0107.875390 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 24, 2026Jul 29, 2026—
00Jul 10, 2024Aug 30, 2023—
00Jun 30, 2023Mar 10, 2023—
00Jan 17, 2019Dec 27, 2018—
00Nov 14, 2013Jan 14, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

757K
bbl, last 12 reported months
9.3M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105759H-1 InjectionActive5,0008421,684–1,748

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 756,893 · prior 12 766,538(-1%)

050K100K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13139300, documented in the API reference.