WELL · 42-131-39419 · DISTRICT 4
Vanco #18
Duval County · Lopez North (Lopez) field · Shut IN · Vertical
Vanco #18 (API 42-131-39419) is a well in Duval County operated by Rattlesnake Operating CO LLC, completed October 10, 2013 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued August 6, 2013, permitted to 3,500 ft.
It was permitted by Sanchez Oil & Gas Corporation and has since transferred to Rattlesnake Operating CO LLC on the wellbore schedule.
Completion filings report 3 formation tops, including 1st Mirando, 2nd Mirando, 3rd Mirando.
Its lease has reported 27.5K barrels of oil since August 2012, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Permitted by Sanchez Oil & Gas Corporation; the EWA schedule now lists a different operator.
Plntersville, TX · P-5 Y, filed May 4, 2026 · 2 permits on file · (907) 229-8398
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rattlesnake Operating Co LLC |
| Production reports | Rattlesnake Operating Co, LLCthrough Mar 2026 |
| Latest permit | Sanchez Oil & Gas CorporationAug 6, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- Aug 6, 2013
- last permit issued
- Oct 10, 2013
- completed
- 27.5K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 10, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Vanco O-4-13743 | Lopez, North (Lopez) | Rattlesnake Operating Co, LLC | 9 | 27.5K | 0 | Aug 2012 – Jul 2026 |
Oil, barrels lease total
Last 12 months 483 · prior 12 1,299(-63%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sanchez Oil & Gas CorporationSep 2012 → Feb 2016
- 2Dallas Petroleum Group, LLCApr 2016 → May 2023
- 3Jalapeno Operating Company, LLCJun 2023 → Aug 2025
- 4Rattlesnake Operating Co, LLCOct 2025 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 767667-99 | Drill | Sanchez Oil & Gas Corporation | Aug 5, 2013 | Aug 6, 2013 | Aug 13, 2013 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-13743 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 554 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 1ST Mirando | 2,135 | -1,581 |
| 2ND Mirando | 2,200 | -1,646 |
| 3RD Mirando | 2,246 | -1,692 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,135 | 2,162 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 426 | 12.25 | 205 S |
| 7 | 2,345 | 8.75 | 185 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 16, 2013 | Nov 18, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-131-39419 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-131-39419 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 226K
- bbl, all reported
- Oct 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000108161 | H-1 Injection | Active | 5,000 | 1,000 | 2,121–2,170 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13139419, documented in the API reference.