WELL · 42-133-01712 · DISTRICT 7

Gallegos Marcus #2

Y

Eastland County · Eastland County Regular (Gas) field · Temp Abandoned  · Vertical

Gallegos Marcus #2 (API 42-133-01712) is a well in Eastland County operated by Anderson Production, completed May 25, 1990 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued August 4, 1988, permitted to 4,000 ft.

It was permitted by Anderson, E. D. and has since transferred to Anderson Production on the wellbore schedule.

Completion filings report one formation top, including Caddo.

No lease production has been reported under this well’s leases.

Operator of record

Anderson Production

Permitted by Anderson, E. D.; the EWA schedule now lists a different operator.

Cisco, TX · P-5 Y, filed Aug 4, 2025 · 3 permits on file · (817) 994-6774

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnderson Production
Production reportsAnderson Productionthrough Jan 2014
Latest permitAnderson, E. D.Aug 4, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Aug 4, 1988
last permit issued
May 25, 1990
completed
0
cumulative oil, bbl
59.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 25, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gallegos, Marcus G-8-135508Eastland County Regular (Gas)Anderson Production1059.4KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anderson, E. D.Jan 1993 → Nov 2009
  2. 2Anderson ProductionDec 2009 → Jan 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
349745-99ReenterAnderson, E. D.Aug 4, 1988Aug 4, 1988—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-135508————

Formation tops

As filed on W-2/G-1. Subsea from 1,562 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,560-1,998

Perforations

Perforated and open-hole intervals.

FromToType
3,6443,654Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7560—50 S
10.7565—50 S
72,322—85 S
4.53,749760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 1991Sep 24, 1990—
00Sep 12, 1990Jul 24, 1990—
00Sep 5, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13301712, documented in the API reference.