WELL · 42-133-31673 · DISTRICT 7
Criswell-Stephenson #1
Eastland County · Foster (Marble Falls) field · Vertical
Criswell-Stephenson #1 (API 42-133-31673) is a plugged well in Eastland County, plugged April 26, 2012, last operated by North Ridge Corporation.
The RRC has issued one drilling permit, issued November 30, 1978, permitted to 4,000 ft.
It was permitted by Eastland Development CO. NO. 1 and has since transferred to North Ridge Corporation on the wellbore schedule.
Completion filings report 2 formation tops, including Marble Falls, Duffer.
Operator of record
Permitted by Eastland Development Co. No. 1; the EWA schedule now lists a different operator.
Duncanville, TX · P-5 Y, filed May 4, 2026 · 377 permits on file · (254) 433-2401
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Ridge Corporation |
| Production reports | North Ridge Corporationthrough Sep 2000 |
| Latest permit | Eastland Development Co. No. 1Nov 30, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Nov 30, 1978
- last permit issued
- Feb 10, 1979
- completed
- 0
- cumulative oil, bbl
- 7.04K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 10, 1979
- Shut in
- —
- Plugged
- Apr 26, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Criswell-Stephenson G-8-133649 | Foster (Marble Falls) | North Ridge Corporation | 1 | 0 | 7.04K | Jan 1993 – Apr 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Ridge CorporationJan 1993 → Sep 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 37784-99 | Drill | Eastland Development Co. No. 1 | Nov 30, 1978 | Nov 30, 1978 | Oct 5, 1978 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-133649 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,612 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 2,976 | -1,364 |
| Duffer | 3,350 | -1,738 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,976 | 2,986 | Perforated |
| 2,976 | 3,012 | Perforated |
| 2,990 | 2,992 | Perforated |
| 3,004 | 3,012 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 368 | 11 | — |
| 5.375 | 2,950 | — | — |
| 4.5 | 3,398 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 17, 1991 | May 10, 1991 | — |
| 00 | Mar 26, 1990 | Mar 9, 1990 | — |
| 00 | Mar 14, 1990 | — | — |
| 00 | Jan 12, 1984 | May 1, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-31673 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-31673 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13331673, documented in the API reference.