WELL · 42-133-31929 · DISTRICT 7

Tindall A #1A

N

Eastland County · Tindall (Strawn) field  · Vertical

Tindall A #1A (API 42-133-31929) is a well in Eastland County operated by North Ridge Corporation, completed May 5, 1985.

The RRC has issued one drilling permit, issued July 19, 1979, permitted to 1,700 ft.

It was permitted by Tyra, C. L. and has since transferred to North Ridge Corporation on the wellbore schedule.

Completion filings report one formation top, including Sand(Orange).

Its 2 leases have reported 55.3K barrels of oil and 49.6K mcf of gas since January 1993, last reporting in July 2026. The leases carry 20 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

North Ridge Corporation

Permitted by Tyra, C. L.; the EWA schedule now lists a different operator.

Duncanville, TX · P-5 Y, filed May 4, 2026 · 377 permits on file · (254) 433-2401

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorth Ridge Corporation
Production reportsBraka Operating, L.L.C.through Dec 2025
Latest permitTyra, C. L.Jul 19, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,700
total depth, ft
1
permits on file
Jul 19, 1979
last permit issued
May 5, 1985
completed
55.3K
cumulative oil, bbl
49.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 5, 1985
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tindall Strawn Unit O-8-27095Tindall (1500)Braka Operating, L.L.C.1655.2K44KDec 1993 – Jul 2026
Tindall "A" O-8-15979Tindall (Strawn)North Ridge Corporation4825.61KJan 1993 – Mar 2008

Oil, barrels lease total

Last 12 months 64 · prior 12 219(-71%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1North Ridge CorporationJan 1993 → Mar 2013
  2. 2Braka Operating, L.L.C.Apr 2013 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
53280-99DrillTyra, C. L.Jul 19, 1979Jul 19, 1979—1,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-15979————
—— O-8-27095————

Formation tops

As filed on W-2/G-1. Subsea from 1,519 ft elevation.Download CSV →

FormationMD ftSubsea
Sand(orange)1,414105

Perforations

Perforated and open-hole intervals.

FromToType
1,4171,434Perforated
1,4201,430Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,375——
4.51,6497.875285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 8, 1995Dec 8, 1994—
00Feb 16, 1994Jun 26, 1985—
00Sep 17, 1985Jun 26, 1985—
00Sep 6, 1985——
00Jan 12, 1984Oct 18, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081736H-1 InjectionActive2507001,420–1,430

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13331929, documented in the API reference.