WELL · 42-133-32087 · DISTRICT 7
Eudy #1
Eastland County · Eastland County Regular (Gas) field · Vertical
Eudy #1 (API 42-133-32087) is a well in Eastland County operated by Seely Oil Company, completed July 29, 1980.
The RRC has issued 2 drilling permits between 1979 and 1980, permitted to 4,100 ft.
Its 2 leases have reported 991 barrels of oil and 232K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Fort Worth, TX · P-5 X, filed Dec 18, 2025 · 153 permits on file · (817) 332-1377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seely Oil Company |
| Production reports | Crystal J Oil and Gas LLCthrough Mar 2026 |
| Latest permit | Seely Oil Co.Jul 14, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,100
- total depth, ft
- 2
- permits on file
- Jul 14, 1980
- last permit issued
- Jul 29, 1980
- completed
- 991
- cumulative oil, bbl
- 232K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 29, 1980
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eudy G-8-162713 | Eastland County Regular | Crystal J Oil and Gas LLC | 1 | 0 | 181K | Apr 1997 – Jul 2026 |
| Eudy O-8-19701 | Eastland County Regular | Stovall, Howard | 1 | 991 | 51.2K | Jan 1993 – Nov 1998 |
Gas, mcf lease total
Last 12 months 605 · prior 12 1,256(-52%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stovall, HowardJan 1993 → Oct 2025
- 2Crystal J Oil and Gas LLCNov 2025 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 86548-99 | Recompletion | Seely Oil Co. | Jul 14, 1980 | Jul 14, 1980 | — | 3,062 |
| 64142-99 | Drill | Seely Oil Co. | Nov 19, 1979 | Nov 19, 1979 | Nov 28, 1979 | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-162713 | — | — | — | — |
| — | — O-8-19701 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,057 | 3,062 | Perforated |
| 3,832 | 3,842 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 295 | 12.25 | 240 S |
| 2.375 | 2,884 | — | — |
| 2.375 | 3,700 | — | — |
| 4.5 | 4,054 | 7.875 | 285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 12, 1997 | May 6, 1997 | — |
| 00 | May 8, 1997 | — | — |
| 00 | Jan 12, 1984 | Apr 25, 1983 | — |
| 00 | Jan 12, 1984 | Feb 15, 1980 | — |
| 00 | Jan 12, 1984 | Jan 2, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-32087 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-32087 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13332087, documented in the API reference.