WELL · 42-133-32382 · DISTRICT 7
Brown Fred #3
Eastland County · Mangum North (3200) field · Vertical
Brown Fred #3 (API 42-133-32382) is a plugged well in Eastland County, plugged June 1, 2026, last operated by JP Oil & Gas LLC.
The RRC has issued one drilling permit, issued June 4, 1980, permitted to 4,100 ft.
It was permitted by Vortt Exploration Company, Inc. and has since transferred to JP Oil & Gas LLC on the wellbore schedule.
Operator of record
Permitted by Vortt Exploration Company, Inc.; the EWA schedule now lists a different operator.
Leavenworth, KS · P-5 Y, filed Feb 4, 2026 · (913) 775-2575
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | JP Oil & Gas LLC |
| Production reports | JP Oil & Gas, LLCthrough Jul 2017 |
| Latest permit | Vortt Exploration Company, Inc.Jun 4, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,100
- total depth, ft
- 1
- permits on file
- Jun 4, 1980
- last permit issued
- Jul 12, 1980
- completed
- 0
- cumulative oil, bbl
- 26.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 12, 1980
- Shut in
- —
- Plugged
- Jun 1, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brown, Fred G-8-142129 | Mangum, North (3200) | JP Oil & Gas, LLC | 1 | 0 | 26.6K | Jan 1993 – Jul 2026 |
| Brown,fred O-8-16287 | Mangum, North (3200) | Herod Investments, Inc. | 2 | 0 | 0 | Jan 1993 – Jul 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Herod Investments, Inc.Jan 1993 → Dec 1998
- 2Carrland Oil & Gas Inc.Jan 1999 → Jun 2000
- 3Nexus Petroleum, Inc.Jul 2000 → Sep 2002
- 4Reh Oil and Gas, LLC.Aug 2009 → Apr 2013
- 5Kraft Oil and Gas, LLCMay 2013 → Apr 2015
- 6JP Oil & Gas, LLCApr 2016 → Jul 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 82958-99 | Drill | Vortt Exploration Company, Inc. | Jun 4, 1980 | Jun 4, 1980 | Jun 27, 1980 | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-142129 | — | — | — | — |
| — | — O-8-16287 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,207 | 3,214 | Perforated |
| 3,207 | 3,218 | Perforated |
| 3,215 | 3,218 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 362 | 12.25 | 240 S |
| 2.375 | 3,072 | — | — |
| 4.5 | 3,364 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 17, 1992 | Aug 20, 1992 | — |
| 00 | Sep 1, 1992 | — | — |
| 00 | Jan 12, 1984 | Jul 21, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-32382 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-32382 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13332382, documented in the API reference.