WELL · 42-133-32491 · DISTRICT 7

Long A #1

N

Eastland County · Foster (Marble Falls) field  · Vertical

Long A #1 (API 42-133-32491) is a well in Eastland County operated by North Ridge Corporation, completed March 1, 1981.

The RRC has issued 3 drilling permits between 1980 and 1998, permitted to 3,900 ft.

Completion filings report 2 formation tops, including Caddo, Marble Falls.

Its 5 leases have reported 3.11K barrels of oil and 62.2K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

North Ridge Corporation

Duncanville, TX · P-5 Y, filed May 4, 2026 · 377 permits on file · (254) 433-2401

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorth Ridge Corporation
Production reportsBraka Operating, L.L.C.through Apr 2026
Latest permitNorth Ridge CorporationApr 24, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,900
total depth, ft
3
permits on file
Apr 24, 1998
last permit issued
Mar 1, 1981
completed
3.11K
cumulative oil, bbl
62.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 1, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Long, Tony "A-1" G-8-267479Foster (Marble Falls)Braka Operating, L.L.C.107.59KJun 2011 – Jul 2026
Long, Tony "A-1" O-8-28482Foster (Marble Falls)Braka Operating, L.L.C.12.23K38.4KApr 1998 – May 2013
Long, Tony "A" O-8-27972Eastland County RegularNorth Ridge Corporation15346.56KSep 1996 – Oct 1998
Long "A" O-8-17145Foster (Marble Falls)North Ridge Corporation13478.83KJan 1993 – Jul 1997
Long, Tony "A" G-8-158360Foster (Marble Falls)North Ridge Corporation10861May 1996 – Nov 1996

Gas, mcf lease total

Last 12 months 26 · prior 12 61(-57%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1North Ridge CorporationJan 1993 → Mar 2013
  2. 2Braka Operating, L.L.C.Apr 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
473327-99RecompletionNorth Ridge CorporationFeb 13, 1998Apr 24, 1998Apr 6, 19983,575
453223-99RecompletionNorth Ridge CorporationSep 27, 1996Oct 1, 1996Sep 22, 19963,575
90861-99DrillSentinel Petroleum Corp.Aug 25, 1980Aug 25, 1980Sep 4, 19803,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-158360————
—— G-8-267479————
—— O-8-17145————
—— O-8-27972————
—— O-8-28482————

Formation tops

As filed on W-2/G-1. Subsea from 1,627 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo2,634-1,007
Marble Falls3,215-1,588

Perforations

Perforated and open-hole intervals.

FromToType
2,6342,644Perforated
3,2153,240Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530711330 S
2.3753,200——
4.53,5107.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 2013Oct 22, 2012Yes
00Jul 28, 1998May 11, 1998Yes
00Jul 15, 1998Oct 14, 1996Yes
00Dec 5, 1996Oct 14, 1996Yes
00Oct 29, 1996——
00Jul 8, 1996Jun 3, 1996—
00Jun 7, 1996——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13332491, documented in the API reference.