WELL · 42-133-33242 · DISTRICT 7

Henry #2

Y

Eastland County · Nimrod E. (Patio) field · Shut IN  · Vertical

Henry #2 (API 42-133-33242) is a well in Eastland County operated by Interstate Explorations LLC, completed September 1, 1981 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued July 30, 1981, permitted to 1,500 ft.

It was permitted by Ridgeway Oil Expl & Dev., Inc and has since transferred to Interstate Explorations LLC on the wellbore schedule.

Completion filings report one formation top, including Crosscut.

Its lease has reported 24.2K barrels of oil and 40 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Interstate Explorations LLC

Permitted by Ridgeway Oil Expl & Dev., Inc; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 4, 2026 · 129 permits on file · (254) 442-1057

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleInterstate Explorations LLC
Production reportsInterstate Explorations LLCthrough Apr 2024
Latest permitRidgeway Oil Expl & Dev., IncJul 30, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,500
total depth, ft
1
permits on file
Jul 30, 1981
last permit issued
Sep 1, 1981
completed
24.2K
cumulative oil, bbl
40
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 1, 1981
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henry O-8-16725Nimrod,e. (Patio)Interstate Explorations LLC324.2K40Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0246202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ridgeway Exco, Inc.Jan 1993 → Mar 1996
  2. 2Big State Industries, Inc.Apr 1996 → Apr 1998
  3. 3Interstate Explorations LLCJun 1998 → Apr 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
127719-99DrillRidgeway Oil Expl & Dev., IncJul 30, 1981Jul 30, 1981Aug 8, 19811,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-16725————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Crosscut1,219

Perforations

Perforated and open-hole intervals.

FromToType
1,2191,220Perforated
1,2191,239Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,200——
4.51,2706.75235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 6, 2003Oct 24, 2002—
00Jan 12, 1984Oct 29, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
131K
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089182H-1 InjectionActive5006081,219–1,239

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13333242, documented in the API reference.