WELL · 42-133-33314 · DISTRICT 7
Massey W.W. #1
Eastland County · Crawford (Marble Falls) field · Vertical
Massey W.W. #1 (API 42-133-33314) is a plugged well in Eastland County, plugged April 1, 2011, last operated by Pearson Lee Roy Iii.
The RRC has issued one drilling permit, issued August 31, 1981, permitted to 3,500 ft.
It was permitted by Gordon Holmes Rhodes and has since transferred to Pearson Lee Roy Iii on the wellbore schedule.
Its 2 leases have reported 7.45K barrels of oil and 42.3K mcf of gas since January 1993, last reporting in August 2011.
Operator of record
Permitted by Gordon Holmes Rhodes; the EWA schedule now lists a different operator.
Eastland, TX · P-5 Y, filed May 4, 2026 · 3 permits on file · (254) 631-3320
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pearson Lee Roy III |
| Production reports | Pearson, Lee Roy IIIthrough May 2008 |
| Latest permit | Gordon Holmes RhodesAug 31, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- Aug 31, 1981
- last permit issued
- Dec 10, 1991
- completed
- 7.45K
- cumulative oil, bbl
- 42.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 10, 1991
- Shut in
- —
- Plugged
- Apr 1, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Massey, W.W. O-8-26537 | Crawford (Marble Falls) | Pearson, Lee Roy III | 1 | 7.45K | 42.3K | Jan 1993 – Aug 2011 |
| — G-8-97037 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gordon, James P., et ALJan 1993 → Sep 1996
- 2Byrne, Robert E.Nov 1996 → May 2003
- 3Pearson, Lee Roy IIIJun 2003 → May 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 131736-99 | Drill | Gordon Holmes Rhodes | Aug 31, 1981 | Aug 31, 1981 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-97037 | — | — | — | — |
| — | — O-8-26537 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,122 | 3,134 | Perforated |
| 3,122 | 3,144 | Perforated |
| 3,138 | 3,144 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 152 | 11 | 90 S |
| 2.375 | 3,020 | — | — |
| 4.5 | 3,300 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 22, 1994 | Oct 27, 1994 | — |
| 00 | Jul 2, 1992 | May 22, 1992 | — |
| 00 | Jun 2, 1992 | — | — |
| 00 | Jan 12, 1984 | Dec 23, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-33314 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-33314 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13333314, documented in the API reference.