WELL · 42-133-33688 · DISTRICT 7
Hutton D #3
Eastland County · Scranton field · Vertical
Hutton D #3 (API 42-133-33688) is a plugged well in Eastland County, plugged July 5, 1991, last operated by Western Production Company.
The RRC has issued one drilling permit, issued January 26, 1982, permitted to 1,750 ft.
It was permitted by Parker Operating CO., Inc. and has since transferred to Western Production Company on the wellbore schedule.
Completion filings report one formation top, including Cross Cut.
Operator of record
Permitted by Parker Operating Co., Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Sep 2, 2016 · 99 permits on file · (817) 205-3368
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Western Production Company |
| Production reports | none |
| Latest permit | Parker Operating Co., Inc.Jan 26, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,750
- total depth, ft
- 1
- permits on file
- Jan 26, 1982
- last permit issued
- Apr 17, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 1985
- Shut in
- —
- Plugged
- Jul 5, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-8-17915 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 151384-99 | Drill | Parker Operating Co., Inc. | Jan 26, 1982 | Jan 26, 1982 | Jan 26, 1982 | 1,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-17915 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,758 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cross Cut | 1,668 | 90 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,679 | 1,681 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 12.25 | 70 S |
| 2.375 | 1,660 | — | — |
| 4.5 | 1,758 | 7.875 | 50 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 23, 1985 | Aug 16, 1985 | — |
| 00 | Jan 12, 1984 | Mar 24, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-33688 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-33688 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 8.16K
- bbl, last 12 reported months
- 10K
- bbl, all reported
- Apr 1991
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000055333 | H-1 Injection | Plugged Jul 30, 1991 | 0 | 0 | 1,679–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 8,158
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13333688, documented in the API reference.