WELL · 42-133-34205 · DISTRICT 7
Foster #1D
Eastland County · Richey (Miss.) field · Vertical
Foster #1D (API 42-133-34205) is a plugged well in Eastland County, plugged May 11, 1998, last operated by Snow Operating CO. Inc..
The RRC has issued 2 drilling permits between 1982 and 1986, permitted to 3,900 ft.
Completion filings report 4 formation tops, including Caddo, Marble Falls, Duffer, Barnett.
Operator of record
Haltom City, TX · P-5 Y, filed Sep 7, 2012 · 42 permits on file · (817) 831-3535
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Snow Operating Co. Inc. |
| Production reports | none |
| Latest permit | Snow Operating Co., Inc.Jun 26, 1986 |
- 3,900
- total depth, ft
- 2
- permits on file
- Jun 26, 1986
- last permit issued
- Feb 18, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 18, 1986
- Shut in
- —
- Plugged
- May 11, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Foster O-8-24085 | Ray Richey (Miss.) | Gruy Petroleum Management Co. | 3 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 303561-99 | Recompletion | Snow Operating Co., Inc. | Jun 23, 1986 | Jun 26, 1986 | — | 3,778 |
| 169942-99 | Drill | Sentinel Petroleum Corp. | Aug 23, 1982 | Aug 23, 1982 | Aug 23, 1982 | 3,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24085 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,471 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,020 | -1,549 |
| Marble Falls | 3,120 | -1,649 |
| Duffer | 3,400 | -1,929 |
| BarnettBARNETT SHALE | 3,554 | -2,083 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,450 | 3,459 | Perforated |
| 3,570 | 3,778 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 199 | 11.625 | 100 S |
| 2.375 | 3,450 | — | — |
| 4.5 | 3,570 | 7.875 | 220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1987 | May 2, 1986 | — |
| 00 | Jan 1, 1987 | — | — |
| 00 | Aug 8, 1986 | May 2, 1986 | — |
| 00 | Jul 25, 1986 | — | — |
| 00 | Jan 12, 1984 | May 6, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-34205 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-34205 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 24.1K
- bbl, all reported
- Apr 1998
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000059752 | H-1 Injection | Plugged May 18, 1998 | 0 | 0 | 3,570–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13334205, documented in the API reference.