WELL · 42-133-34330 · DISTRICT 7

Brawner #18

Y

Eastland County · Waldrop (Strawn) field · Injection  · Vertical

Brawner #18 (API 42-133-34330) is a well in Eastland County operated by Hipp Oil And Gas Inc., completed December 10, 1985 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 22, 1982, permitted to 1,200 ft.

It was permitted by Petro-Mack, Inc. and has since transferred to Hipp Oil And Gas Inc. on the wellbore schedule.

Completion filings report one formation top, including Palo Pinto.

Its lease has reported 10.6K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 20 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 914 barrels injected in the 12 months reported through April 2025.

Operator of record

Hipp Oil and Gas Inc.

Permitted by Petro-Mack, Inc.; the EWA schedule now lists a different operator.

Big Spring, TX · P-5 Y, filed May 4, 2026 · (432) 466-9691

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHipp Oil and Gas Inc.
Production reportsHipp Oil and Gas Inc.through Feb 2026
Latest permitPetro-Mack, Inc.Oct 22, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,200
total depth, ft
1
permits on file
Oct 22, 1982
last permit issued
Dec 10, 1985
completed
10.6K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 10, 1985
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brawner O-8-19260Waldrop (Strawn)Hipp Oil and Gas Inc.2010.6K19Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 40 · prior 12 5(+700%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ames OilJan 1993 → Jul 1994
  2. 2Eddie's Royalties, Inc.Aug 1994 → Aug 2018
  3. 3R L S Oil and GasJun 2014 → Oct 2015
  4. 4Hipp Oil and Gas Inc.Sep 2018 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
175181-99DrillPetro-Mack, Inc.Oct 22, 1982Oct 22, 1982—1,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-19260————

Formation tops

As filed on W-2/G-1. Subsea from 1,657 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto1,109548

Perforations

Perforated and open-hole intervals.

FromToType
1,1091,115Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,100——
4.51,1517.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 1986Apr 14, 1986—
00Jan 12, 1984Jan 5, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

914
bbl, last 12 reported months
88.1K
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058438H-1 InjectionActive2505001,109–1,115

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 914 · prior 12 1,741(-48%)

05010015020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13334330, documented in the API reference.