WELL · 42-133-34449 · DISTRICT 7
Broyles J. N. #7
Eastland County · Madewell (Cross Cut) field · Vertical
Broyles J. N. #7 (API 42-133-34449) is a plugged well in Eastland County, plugged November 30, 2017, last operated by Shilynn Inc..
The RRC has issued one drilling permit, issued November 29, 1982, permitted to 2,000 ft.
It was permitted by Nimrod Operating CO. and has since transferred to Shilynn Inc. on the wellbore schedule.
Its lease has reported 21K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Nimrod Operating Co.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Jun 5, 2020 · (325) 725-0961
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shilynn Inc. |
| Production reports | HD Special-Situations, LPthrough Oct 2013 |
| Latest permit | Nimrod Operating Co.Nov 29, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Nov 29, 1982
- last permit issued
- Nov 25, 1982
- completed
- 21K
- cumulative oil, bbl
- 22
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 25, 1982
- Shut in
- —
- Plugged
- Nov 30, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Broyles, J. N. O-8-18578 | Madewell (Cross Cut) | Shilynn, Inc. | 8 | 21K | 22 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Greer and Splawn Investments IncJan 1993 → Feb 1994
- 2First American Operating Co.Mar 1994 → Jul 1995
- 3Regal OperatingAug 1995 → Dec 1995
- 4Ener/Cology Operating, Inc.Jan 1996 → Jun 1999
- 5Bar Operating Production Co.Jul 1999 → May 2001
- 6K & S Petroleum CompanyJun 2001 → Apr 2007
- 7HD Special-Situations, LPAug 2011 → Oct 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 178417-99 | Drill | Nimrod Operating Co. | Nov 29, 1982 | Nov 29, 1982 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-18578 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,358 | 1,362 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 1,357 | — | — |
| 4.5 | 1,419 | 6.75 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 12, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-34449 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-34449 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13334449, documented in the API reference.