WELL · 42-133-34974 · DISTRICT 7

Kid #1

Plugged

Eastland County  · Vertical

Kid #1 (API 42-133-34974) is a plugged well in Eastland County, plugged May 4, 1984, last operated by Fishtail Trading CO.

The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 1,995 ft.

Completion filings report one formation top, including Cisco.

Operator of record

Fishtail Trading Co

Granbury, TX · P-5 Y, filed Jan 7, 2000 · 27 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitFishtail Trading CoAug 1, 1984
1,995
total depth, ft
2
permits on file
Aug 1, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 4, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
247035-99OtherFishtail Trading CoAug 1, 1984Aug 1, 1984—1,380
195434-99DrillPierce-Western OilMay 18, 1983May 18, 1983—1,995

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
CiscoCISCO SAND1,327

Perforations

Perforated and open-hole intervals.

FromToType
1,3271,329Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,3807.87550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 21, 1985Nov 2, 1984—
00Jan 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13334974, documented in the API reference.