WELL · 42-133-35667 · DISTRICT 7

Baskin #2

Plugged

Eastland County · Eastland County Regular field  · Vertical

Baskin #2 (API 42-133-35667) is a plugged well in Eastland County, plugged September 20, 2011, last operated by Allstate Petroleum Oper. Inc..

The RRC has issued one drilling permit (amended once), issued February 10, 1984, permitted to 4,500 ft.

Completion filings report one formation top, including Caddo.

Its lease has reported 19.9K barrels of oil and 10.3K mcf of gas since January 1993, last reporting in August 2021. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Allstate Petroleum Oper. Inc.

Cross Plains, TX · P-5 Y, filed Mar 4, 1994 · 17 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAllstate Petroleum Oper. Inc.
Production reportsXplore Operating, LLCthrough Mar 2020
Latest permitAllstate Petroleum Oper. Inc.Feb 10, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
2
permits on file
Feb 10, 1984
last permit issued
Jul 1, 1984
completed
19.9K
cumulative oil, bbl
10.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 1984
Shut in
—
Plugged
Sep 20, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Baskin Fee O-8-20917Barton (Caddo Lower)Xplore Operating, LLC519.9K10.3KJan 1993 – Aug 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Joint Resources CompanyJan 1993 → Dec 2003
  2. 2KTC Oil Enterprises, LLCJan 2004 → Apr 2006
  3. 3DBC Operating Company LLCSep 2010 → May 2014
  4. 4Xplore Operating, LLCJun 2014 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
229178-98DrillAllstate Petroleum Oper. Inc.Nov 16, 1987Feb 10, 1984—4,500
229178-99DrillAllstate Petroleum Oper. Inc.Mar 20, 1984Feb 10, 1984Mar 28, 19844,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-20917————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Caddo2,385

Perforations

Perforated and open-hole intervals.

FromToType
2,3852,397Perforated
2,4132,416Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251011180 S
4.53,170——
4.53,1727.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 6, 2006Sep 12, 2005—
00Dec 1, 1987Jul 18, 1984—
00Nov 7, 1987——
00Aug 7, 1984Jul 19, 1984—
00Aug 1, 1984Jul 19, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077024H-1 InjectionPlugged Dec 21, 20115006002,382–2,390

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13335667, documented in the API reference.