WELL · 42-133-35687 · DISTRICT 7

Robinson #1

Plugged

Eastland County · Eastland County Regular field  · Vertical

Robinson #1 (API 42-133-35687) is a plugged well in Eastland County, plugged December 27, 1988, last operated by Herod Bill.

The RRC has issued one drilling permit, issued February 21, 1984, permitted to 1,000 ft.

Completion filings report one formation top, including Strawn.

Operator of record

Herod Bill

Ranger, TX · P-5 Y, filed Feb 4, 2022 · 26 permits on file · (254) 631-1445

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHerod Bill
Production reportsnone
Latest permitHerod, BillFeb 21, 1984
1,000
total depth, ft
1
permits on file
Feb 21, 1984
last permit issued
Mar 9, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 9, 1984
Shut in
—
Plugged
Dec 27, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
229971-99DrillHerod, BillFeb 17, 1984Feb 21, 1984Feb 25, 19841,000

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
StrawnSTRAWN SERIES—

Perforations

Perforated and open-hole intervals.

FromToType
818822Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512.2585 S
4.58816.7560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 1985Mar 15, 1984—
00Apr 3, 1984Mar 15, 1984—
00Mar 22, 1984Mar 15, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13335687, documented in the API reference.