WELL · 42-133-35747 · DISTRICT 7

Earnest (Lake Sand) Unit #2

Plugged

Eastland County · Ranger (Black Lime West) field  · Vertical

Earnest (Lake Sand) Unit #2 (API 42-133-35747) is a plugged well in Eastland County, plugged September 11, 1998, last operated by Yellow Rose Oil & Gas Oper. Inc..

The RRC has issued one drilling permit, issued March 16, 1984, permitted to 3,850 ft.

It was permitted by Ridge Oil Company and has since transferred to Yellow Rose Oil & Gas Oper. Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Marble Falls, Duffer.

Its 2 leases have reported 2.74K barrels of oil and 131K mcf of gas since January 1993, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

Yellow Rose Oil & Gas Oper. Inc.

Permitted by Ridge Oil Company; the EWA schedule now lists a different operator.

Cisco, TX · P-5 Y, filed Nov 4, 2025 · 5 permits on file · (325) 721-4751

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleYellow Rose Oil & Gas Oper. Inc.
Production reportsEastland Operating, L.L.C.through Mar 2003
Latest permitRidge Oil CompanyMar 16, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,850
total depth, ft
1
permits on file
Mar 16, 1984
last permit issued
Apr 13, 1984
completed
2.74K
cumulative oil, bbl
131K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 13, 1984
Shut in
—
Plugged
Sep 11, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Earnest (Lake Sand) Unit O-8-24463Ranger (Black Lime West)Eastland Operating, L.L.C.102.74K128KJan 1993 – Jul 2026
Earnest (Lake Sand) Unit G-8-138019Ranger (Black Lime West)Yellow Rose Oil & Gas Oper. Inc.102.86KJan 1993 – Sep 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mustang Oil & Gas CorporationJan 1993 → Jun 1998
  2. 2Gruy Petroleum Management Co.Jul 1998 → Jan 1999
  3. 3R & B Energy Co.Feb 1999 → Nov 1999
  4. 4Eastland Operating, L.L.C.Dec 1999 → Mar 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
232568-99DrillRidge Oil CompanyMar 15, 1984Mar 16, 1984Mar 18, 19843,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-138019————
—— O-8-24463————

Formation tops

As filed on W-2/G-1. Subsea from 1,575 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO LS.3,100-1,525
Marble FallsMARBLE FALLS LS.3,406-1,831
DufferDUFFER LS.3,756-2,181

Perforations

Perforated and open-hole intervals.

FromToType
3,4103,424Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520812.25150 S
4.53,8627.875120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 1991Apr 24, 1991—
00May 8, 1991——
00Aug 21, 1987Apr 18, 1984—
00Aug 13, 1987——
00May 24, 1984Apr 18, 1984—
00May 12, 1984Apr 18, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13335747, documented in the API reference.