WELL · 42-133-35833 · DISTRICT 7
Caton, Nell #1
Eastland County · Vertical
Caton, Nell #1 (API 42-133-35833) is a permitted well in Eastland County filed by North Ridge Corporation; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1984 and 2006, permitted to 4,000 ft.
Completion filings report 2 formation tops, including Caddo, Marble Falls.
Its 2 leases have reported 1.51K barrels of oil and 46.7K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Duncanville, TX · P-5 Y, filed May 4, 2026 · 377 permits on file · (254) 433-2401
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Bacon Energythrough Mar 2025 |
| Latest permit | North Ridge CorporationMar 6, 2006 |
- 4,000
- total depth, ft
- 2
- permits on file
- Mar 6, 2006
- last permit issued
- —
- completed
- 1.51K
- cumulative oil, bbl
- 46.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Caton, Nell G-8-226473 | Reb (Marble Falls) | Bacon Energy | 1 | 0 | 2.11K | Apr 2007 – Jul 2026 |
| Caton, Nell O-8-21460 | Reb (Marble Falls) | Bacon Energy | 1 | 1.51K | 44.6K | Jan 1993 – Aug 2013 |
Gas, mcf lease total
Last 12 months 0 · prior 12 474(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Ridge CorporationJan 1993 → Nov 2009
- 2Bacon EnergyJul 2016 → Mar 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 614922-99 | Recompletion | North Ridge Corporation | Feb 27, 2006 | Mar 6, 2006 | — | 3,869 |
| 236699-99 | Drill | North Ridge Corporation | Apr 23, 1984 | Apr 24, 1984 | May 28, 1984 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-226473 | — | — | — | — |
| — | — O-8-21460 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,501 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,078 | -1,577 |
| Marble Falls | 3,484 | -1,983 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,385 | 3,405 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 225 | 11 | 160 S |
| 4.5 | 3,860 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 2007 | Apr 24, 2007 | — |
| 00 | May 4, 2007 | — | — |
| 00 | Sep 5, 1984 | Aug 3, 1984 | — |
| 00 | Aug 24, 1984 | Aug 3, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-35833 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-35833 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13335833, documented in the API reference.