WELL · 42-133-36022 · DISTRICT 7
Garrett, Sallie #2
Eastland County · Vertical
Garrett, Sallie #2 (API 42-133-36022) is a permitted well in Eastland County filed by North Ridge Corporation; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1984 and 2005, permitted to 4,000 ft.
Completion filings report 3 formation tops, including Caddo, Marble Falls, Duffer.
Operator of record
Duncanville, TX · P-5 Y, filed May 4, 2026 · 377 permits on file · (254) 433-2401
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Braka Operating, L.L.C.through May 2024 |
| Latest permit | North Ridge CorporationJul 5, 2005 |
- 4,000
- total depth, ft
- 3
- permits on file
- Jul 5, 2005
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 627K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Garrett, Sallie G-8-212279 | North Ridge (Duffer) | Braka Operating, L.L.C. | 1 | 0 | 310K | Jul 2005 – Jun 2024 |
| Garrett, Sallie G-8-134896 | Reb (Marble Falls) | North Ridge Corporation | 1 | 0 | 317K | Jan 1993 – Sep 2005 |
| — O-8-21776 | — | — | 0 | 0 | 0 | — |
Gas, mcf lease total
Last 12 months 0 · prior 12 386(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North Ridge CorporationJan 1993 → Mar 2013
- 2Braka Operating, L.L.C.Apr 2013 → May 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 602626-99 | Recompletion | North Ridge Corporation | Jun 27, 2005 | Jul 5, 2005 | — | 3,800 |
| 428032-99 | Recompletion | North Ridge Corporation | Sep 14, 1994 | Sep 15, 1994 | — | 3,800 |
| 248572-99 | Drill | North Ridge Corporation | Aug 15, 1984 | Aug 16, 1984 | Aug 21, 1984 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-134896 | — | — | — | — |
| — | — G-8-212279 | — | — | — | — |
| — | — O-8-21776 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,538 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,054 | -1,516 |
| Marble Falls | 3,362 | -1,824 |
| Duffer | 3,689 | -2,151 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,364 | 3,408 | Perforated |
| 3,689 | 3,740 | Perforated |
| — | 3,408 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 250 | 11 | 125 S |
| 4.5 | 3,796 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 30, 2006 | Sep 26, 2005 | Yes |
| 00 | Nov 22, 2005 | — | — |
| 00 | Aug 30, 1990 | Jun 29, 1990 | — |
| 00 | Aug 24, 1990 | — | — |
| 00 | Nov 20, 1984 | Oct 11, 1984 | — |
| 00 | Nov 15, 1984 | — | — |
| 00 | Nov 2, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-36022 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-36022 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13336022, documented in the API reference.