WELL · 42-133-36160 · DISTRICT 7
Hildegard #1
Eastland County · Reb (Marble Falls) field · Vertical
Hildegard #1 (API 42-133-36160) is a plugged well in Eastland County, plugged October 21, 2022, last operated by JD Operating.
The RRC has issued one drilling permit, issued October 17, 1984, permitted to 3,600 ft.
It was permitted by Ridge Oil Company and has since transferred to JD Operating on the wellbore schedule.
Completion filings report one formation top, including Marble Falls.
Operator of record
Permitted by Ridge Oil Company; the EWA schedule now lists a different operator.
Eastland, TX · P-5 Y, filed Aug 4, 2025 · (254) 433-3167
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | JD Operating |
| Production reports | JD Operatingthrough Aug 2022 |
| Latest permit | Ridge Oil CompanyOct 17, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,600
- total depth, ft
- 1
- permits on file
- Oct 17, 1984
- last permit issued
- Dec 21, 1984
- completed
- 0
- cumulative oil, bbl
- 241K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 21, 1984
- Shut in
- —
- Plugged
- Oct 21, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hildegard G-8-128925 | Reb (Marble Falls) | JD Operating | 1 | 0 | 241K | Jan 1993 – Oct 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ridge Oil CompanyJan 1993 → Feb 1997
- 2D & R EnterprisesMar 1997 → Oct 2020
- 3JD OperatingNov 2020 → Aug 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 255143-99 | Drill | Ridge Oil Company | Feb 19, 1985 | Oct 17, 1984 | — | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-128925 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,562 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble FallsMARBLE FALLS LS. | 3,220 | -1,658 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,220 | 3,240 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 125 | 12.25 | 100 S |
| 4.5 | 3,450 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 1, 1988 | Nov 7, 1988 | — |
| 00 | Nov 29, 1988 | — | — |
| 00 | May 7, 1985 | Feb 15, 1985 | — |
| 00 | May 2, 1985 | — | — |
| 00 | Jan 21, 1985 | Dec 27, 1984 | — |
| 00 | Jan 10, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-36160 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-36160 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13336160, documented in the API reference.