WELL · 42-133-36226 · DISTRICT 7

Wright -A- #5A

Plugged

Eastland County · Nimrod (Cross Cut) field  · Vertical

Wright -A- #5A (API 42-133-36226) is a plugged well in Eastland County, plugged September 7, 1989, last operated by Transworld Pipe & Supply CO..

The RRC has issued one drilling permit, issued December 3, 1984, permitted to 1,500 ft.

It was permitted by Monarch Energy Corporation and has since transferred to Transworld Pipe & Supply CO. on the wellbore schedule.

Completion filings report one formation top, including Cross-Cut.

Operator of record

Transworld Pipe & Supply Co.

Permitted by Monarch Energy Corporation; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Apr 13, 1990

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTransworld Pipe & Supply Co.
Production reportsnone
Latest permitMonarch Energy CorporationDec 3, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,500
total depth, ft
1
permits on file
Dec 3, 1984
last permit issued
Jul 31, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 31, 1985
Shut in
—
Plugged
Sep 7, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
259667-99DrillMonarch Energy CorporationMay 13, 1985Dec 3, 1984—1,500

Formation tops

As filed on W-2/G-1. Subsea from 1,744 ft elevation.Download CSV →

FormationMD ftSubsea
Cross-Cut1,377367

Perforations

Perforated and open-hole intervals.

FromToType
1,3771,379Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,4006.75—
4.51,4086.75225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 13, 1987Nov 24, 1986—
00Dec 31, 1985Oct 21, 1985—
00Dec 14, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 1989
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060354H-1 InjectionPlugged Nov 13, 1989001,377–0

MONTHLY INJECTED, BBL · H-10 · LAST 2 REPORTED MONTHS

Last 12 months 0

011989

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13336226, documented in the API reference.