WELL · 42-133-36313 · DISTRICT 7
Owen B.B. Estate #1
Eastland County · H.P.C. (Conglomerate) field · Vertical
Owen B.B. Estate #1 (API 42-133-36313) is a plugged well in Eastland County, plugged July 25, 2025, last operated by Texxol Operating Company Inc..
The RRC has issued one drilling permit, issued January 21, 1985, permitted to 4,200 ft.
It was permitted by Richey & Company, Inc. and has since transferred to Texxol Operating Company Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Strawn, Caddo, Lake Sd.
Its lease has reported 6.86K barrels of oil and 217K mcf of gas since January 1993, last reporting in August 2025.
Operator of record
Permitted by Richey & Company, Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Feb 4, 2026 · 20 permits on file · (800) 800-2908
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texxol Operating Company Inc. |
| Production reports | Texxol Operating Company, Inc.through Aug 2017 |
| Latest permit | Richey & Company, Inc.Jan 21, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,200
- total depth, ft
- 1
- permits on file
- Jan 21, 1985
- last permit issued
- Jan 25, 1985
- completed
- 6.86K
- cumulative oil, bbl
- 217K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 25, 1985
- Shut in
- —
- Plugged
- Jul 25, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Owen, B.B. Estate O-8-22114 | H.P.C. (Conglomerate) | Texxol Operating Company, Inc. | 1 | 6.86K | 217K | Jan 1993 – Aug 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Richey, Ray Management Co., Inc.Jan 1993 → Jul 2013
- 2Texxol Operating Company, Inc.Aug 2013 → Nov 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 264990-99 | Drill | Richey & Company, Inc. | Dec 19, 1984 | Jan 21, 1985 | — | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-22114 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,570 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,662 | 3,676 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 298 | 12.25 | 200 S |
| 4.5 | 4,019 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 13, 1985 | Feb 11, 1985 | — |
| 00 | Mar 7, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-36313 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-36313 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13336313, documented in the API reference.