WELL · 42-133-36496 · DISTRICT 7
Callarman #3
Eastland County · Katlaco-Cook (Miss) field · Vertical
Callarman #3 (API 42-133-36496) is a plugged well in Eastland County, plugged October 18, 2023, last operated by Katlaco Operating CO. Inc..
The RRC has issued one drilling permit, issued May 21, 1985, permitted to 4,300 ft.
Completion filings report 4 formation tops, including Caddo, Lake Sand, Mississippian, Ellenburger.
Its lease has reported 18.6K barrels of oil and 86.9K mcf of gas since January 1993, last reporting in March 2024. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Lubbock, TX · P-5 Y, filed Jan 3, 1992 · 52 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Katlaco Operating Co. Inc. |
| Production reports | Callarman, Davidthrough Jun 2023 |
| Latest permit | Katlaco Operating Co., Inc.May 21, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,300
- total depth, ft
- 1
- permits on file
- May 21, 1985
- last permit issued
- Jun 18, 1985
- completed
- 18.6K
- cumulative oil, bbl
- 86.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 18, 1985
- Shut in
- —
- Plugged
- Oct 18, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Callarman O-8-22618 | Katlaco-Cook (Miss) | Interstate Explorations LLC | 2 | 18.6K | 86.9K | Jan 1993 – Mar 2024 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lubbock Energy, Inc.Jan 1993 → Feb 1996
- 2Callarman, DavidApr 1997 → Jun 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 275633-99 | Drill | Katlaco Operating Co., Inc. | May 6, 1985 | May 21, 1985 | — | 4,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-22618 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,621 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,030 | -1,409 |
| Lake Sand | 3,440 | -1,819 |
| Mississippian | 3,917 | -2,296 |
| EllenburgerELLENBERGER | 4,120 | -2,499 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,920 | 3,934 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 506 | 11 | 200 S |
| 4.5 | 4,166 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 1, 1985 | Jul 1, 1985 | — |
| 00 | Jul 16, 1985 | Jul 1, 1985 | — |
| 00 | Jul 11, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-36496 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-36496 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13336496, documented in the API reference.