WELL · 42-133-36691 · DISTRICT 7

Mulloy J.J. #3

N

Eastland County · King-Tindall (Miss.) field  · Vertical

Mulloy J.J. #3 (API 42-133-36691) is a well in Eastland County operated by North Ridge Corporation, completed January 26, 1987.

The RRC has issued 3 drilling permits between 1985 and 2004, permitted to 4,000 ft.

Completion filings report 2 formation tops, including Strawn, Caddo.

Its 3 leases have reported 2K barrels of oil and 139K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

North Ridge Corporation

Duncanville, TX · P-5 Y, filed May 4, 2026 · 377 permits on file · (254) 433-2401

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorth Ridge Corporation
Production reportsNorth Ridge Corporationthrough May 2006
Latest permitNorth Ridge CorporationNov 18, 2004
4,000
total depth, ft
3
permits on file
Nov 18, 2004
last permit issued
Jan 26, 1987
completed
2K
cumulative oil, bbl
139K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 26, 1987
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mulloy, J J O-8-29456Lake Leon (Duffer)Braka Operating, L.L.C.100Nov 2004 – Jul 2026
Mulloy, J.J. O-8-24140King-Tindall (Miss.)North Ridge Corporation21.55K103KJan 1993 – Jun 2007
Mulloy, J. J. O-8-28295Eastland County RegularNorth Ridge Corporation144536KMar 1997 – Jun 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1North Ridge CorporationJan 1993 → Feb 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
553853-99RecompletionNorth Ridge CorporationNov 18, 2004Nov 18, 2004Oct 4, 20043,710
460785-99RecompletionNorth Ridge CorporationApr 7, 1997Apr 10, 1997Mar 3, 19973,710
287695-99DrillNorth Ridge CorporationNov 4, 1985Oct 17, 1985—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24140————
—— O-8-28295————
—— O-8-29456————

Formation tops

As filed on W-2/G-1. Subsea from 1,492 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn1,4893
Caddo2,838-1,346

Perforations

Perforated and open-hole intervals.

FromToType
2,8382,861Perforated
3,1213,148Perforated
3,4743,490Perforated
3,5463,616Perforated
3,6023,606Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510812.2585 S
4.53,7077.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2005Nov 22, 2004—
00Mar 21, 2005Nov 22, 2004—
00Dec 2, 2004Dec 3, 1997—
00Dec 15, 1997Dec 3, 1997—
00Dec 12, 1997Apr 21, 1997Yes
00Nov 18, 1997Feb 4, 1987Yes
00Feb 18, 1987Feb 4, 1987Yes
00Feb 11, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
420K
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094050H-1 InjectionActive7501,5003,546–3,660

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13336691, documented in the API reference.