WELL · 42-133-36908 · DISTRICT 7
Elam #3
Eastland County · Eastland County Regular field · Vertical
Elam #3 (API 42-133-36908) is a plugged well in Eastland County, plugged April 24, 2017, last operated by Pitcock Inc..
The RRC has issued 2 drilling permits between 1986 and 2015, permitted to 4,500 ft.
Completion filings report 2 formation tops, including Caddo, Duffer.
Its 2 leases have reported 102K barrels of oil and 484K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Graham, TX · P-5 Y, filed Jun 4, 2026 · 265 permits on file · (940) 550-5255
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pitcock Inc. |
| Production reports | Pitcock, Inc.through Apr 2026 |
| Latest permit | Pitcock, Inc.Dec 10, 2015 |
- 4,500
- total depth, ft
- 2
- permits on file
- Dec 10, 2015
- last permit issued
- Dec 11, 2015
- completed
- 102K
- cumulative oil, bbl
- 484K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 11, 2015
- Shut in
- —
- Plugged
- Apr 24, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Elam O-8-23548 | Doug Cook (Duffer) | Pitcock, Inc. | 4 | 93.9K | 462K | Jan 1993 – Jul 2026 |
| Elam O-8-29695 | Eastland County Regular | Pitcock, Inc. | 2 | 7.71K | 22.3K | Mar 2006 – Jul 2026 |
Oil, barrels lease total
Last 12 months 470 · prior 12 693(-32%)
Gas, mcf lease total
Last 12 months 1,902 · prior 12 1,955(-3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pitcock, Inc.Jan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 812444-99 | Recompletion | Pitcock, Inc. | Dec 2, 2015 | Dec 10, 2015 | Jul 13, 1986 | 4,500 |
| 303555-99 | Drill | Pitcock, Inc. | Jun 24, 1986 | Jun 26, 1986 | Jul 13, 1986 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-23548 | — | — | — | — |
| — | — O-8-29695 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,737 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,017 | 3,021 | Perforated |
| 3,037 | 3,043 | Perforated |
| 3,844 | 3,854 | Perforated |
| 3,960 | 3,970 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 367 | 12.25 | 270 S |
| 4.5 | 4,185 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 18, 2016 | Dec 16, 2015 | — |
| 00 | Feb 14, 1994 | Nov 19, 1993 | — |
| 00 | Sep 2, 1986 | Aug 21, 1986 | Yes |
| 00 | Aug 29, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-36908 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-36908 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 4.93K
- bbl, last 12 reported months
- 201K
- bbl, all reported
- Apr 2015
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000080077 | H-1 Injection | Plugged May 3, 2017 | 200 | 1,200 | 3,844–3,854 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 4,929 · prior 12 11,513(-57%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13336908, documented in the API reference.