WELL · 42-133-36963 · DISTRICT 7
Elam #4
Eastland County · Doug Cook (Duffer) field · Vertical
Elam #4 (API 42-133-36963) is a well in Eastland County operated by Pitcock Inc., completed October 30, 1986.
The RRC has issued 2 drilling permits between 1986 and 2006, permitted to 4,500 ft.
Completion filings report 4 formation tops, including Palo Pinto, Patio Lime, Caddo, Duffer.
Its 2 leases have reported 102K barrels of oil and 484K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Graham, TX · P-5 Y, filed Jun 4, 2026 · 265 permits on file · (940) 550-5255
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pitcock Inc. |
| Production reports | Pitcock, Inc.through Apr 2026 |
| Latest permit | Pitcock, Inc.Mar 29, 2006 |
- 4,500
- total depth, ft
- 2
- permits on file
- Mar 29, 2006
- last permit issued
- Oct 30, 1986
- completed
- 102K
- cumulative oil, bbl
- 484K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 30, 1986
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Elam O-8-23548 | Doug Cook (Duffer) | Pitcock, Inc. | 4 | 93.9K | 462K | Jan 1993 – Jul 2026 |
| Elam O-8-29695 | Eastland County Regular | Pitcock, Inc. | 2 | 7.71K | 22.3K | Mar 2006 – Jul 2026 |
Oil, barrels lease total
Last 12 months 470 · prior 12 693(-32%)
Gas, mcf lease total
Last 12 months 1,902 · prior 12 1,955(-3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pitcock, Inc.Jan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 616389-99 | Recompletion | Pitcock, Inc. | Mar 23, 2006 | Mar 29, 2006 | — | 4,500 |
| 320803-99 | Drill | Pitcock, Inc. | Sep 19, 1986 | Sep 23, 1986 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-23548 | — | — | — | — |
| — | — O-8-29695 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,734 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 1,519 | 215 |
| Patio Lime | 1,519 | 215 |
| Caddo | 2,976 | -1,242 |
| Caddo | 3,028 | -1,294 |
| Duffer | 3,850 | -2,116 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,976 | 2,982 | Perforated |
| 2,990 | 2,996 | Perforated |
| 3,018 | 3,024 | Perforated |
| 3,900 | 3,910 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 344 | 12.25 | 230 S |
| 4.5 | 4,186 | 7.875 | 465 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 9, 2006 | Mar 23, 2006 | Yes |
| 00 | Mar 31, 2006 | — | — |
| 00 | Dec 1, 1986 | Nov 4, 1986 | Yes |
| 00 | Nov 20, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-36963 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-36963 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13336963, documented in the API reference.