WELL · 42-133-36998 · DISTRICT 7
East Allen Ranch #1
Eastland County · Eastland County Regular field · Vertical
East Allen Ranch #1 (API 42-133-36998) is a plugged well in Eastland County, plugged April 19, 1996, last operated by Kornye-Tillman Company.
The RRC has issued 2 drilling permits (amended once) between 1986 and 2004, permitted to 3,800 ft.
Completion filings report 5 formation tops, including Strawn, Marble Falls, U Bend Comglomerate, U Bend Conglomerate.
Its 2 leases have reported 70 barrels of oil and 735 mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 1.89K barrels injected in the 12 months reported through April 2025.
Operator of record
Cleburne, TX · P-5 Y, filed Oct 4, 2025 · 34 permits on file · (817) 832-4338
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kornye-Tillman Company |
| Production reports | Kornye-Tillman Companythrough Nov 1995 |
| Latest permit | Kornye-Tillman CompanyJun 1, 2004 |
- 3,800
- total depth, ft
- 3
- permits on file
- Jun 1, 2004
- last permit issued
- Jan 3, 1987
- completed
- 70
- cumulative oil, bbl
- 735
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 3, 1987
- Shut in
- —
- Plugged
- Apr 19, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| East Allen Ranch O-8-29550 | Eastland County Regular | Blackbird R 22 OG L.L.C. | 1 | 0 | 0 | Feb 2005 – Jul 2026 |
| East Allen Ranch O-8-24460 | Eastland County Regular | Kornye-Tillman Company | 1 | 70 | 735 | Jan 1993 – Jul 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kornye-Tillman CompanyMar 1995 → Nov 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 546329-99 | Reenter | Kornye-Tillman Company | Jun 1, 2004 | Jun 1, 2004 | Jun 15, 2004 | 1,600 |
| 323463-98 | Drill | Sun Expl. & Prod. Co.-Abilene | Jul 30, 1987 | Nov 26, 1986 | — | 3,480 |
| 323463-99 | Drill | Expanding Energy Corporation | Nov 24, 1986 | Nov 26, 1986 | — | 3,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24460 | — | — | — | — |
| — | — O-8-29550 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,429 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 1,238 | 191 |
| Marble Falls | 3,105 | -1,676 |
| U Bend Comglomerate | 3,120 | -1,691 |
| U Bend Conglomerate | 3,120 | -1,691 |
| DufferDUFFER LIME | 3,404 | -1,975 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,226 | 1,246 | Perforated |
| 1,262 | 1,272 | Perforated |
| 1,290 | 1,312 | Perforated |
| 3,122 | 3,134 | Perforated |
| 3,408 | 3,418 | Perforated |
| 3,432 | 3,432 | Perforated |
| 3,432 | 3,438 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 321 | 12.25 | 240 S |
| 4.5 | 1,471 | 7.875 | 305 S |
| 4.5 | 3,480 | 7.875 | 140 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 29, 2005 | Feb 25, 2005 | — |
| 00 | May 4, 2005 | — | — |
| 00 | Mar 3, 1988 | Jan 20, 1988 | Yes |
| 00 | Aug 21, 1987 | Jul 31, 1987 | Yes |
| 00 | Aug 13, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-36998 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-36998 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 1.89K
- bbl, last 12 reported months
- 79.9K
- bbl, all reported
- Apr 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000093397 | H-1 Injection | Active | 500 | 600 | 1,200–1,350 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 1,891 · prior 12 1,424(+33%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13336998, documented in the API reference.