WELL · 42-133-37065 · DISTRICT 7
Nixon #2
Eastland County · Eastland County Regular field · Vertical
Nixon #2 (API 42-133-37065) is a plugged well in Eastland County, plugged January 10, 1992, last operated by Lowrance Inc..
The RRC has issued 2 drilling permits between 1987 and 1991, permitted to 4,000 ft.
Completion filings report 6 formation tops, including Strawn, Caddo, Marble Falls, Ranger.
Operator of record
Eastland, TX · P-5 Y, filed Jun 4, 2026 · 4 permits on file · (254) 433-1155
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lowrance Inc. |
| Production reports | none |
| Latest permit | Lowrance Inc.Apr 8, 1991 |
- 4,000
- total depth, ft
- 2
- permits on file
- Apr 8, 1991
- last permit issued
- Mar 5, 1991
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 5, 1991
- Shut in
- —
- Plugged
- Jan 10, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-8-24476 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 386436-99 | Recompletion | Lowrance Inc. | Apr 5, 1991 | Apr 8, 1991 | Mar 3, 1991 | 4,000 |
| 329249-99 | Drill | Snow Operating Co., Inc. | Apr 20, 1987 | Apr 20, 1987 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24476 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,624 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 1,990 | -366 |
| Caddo | 3,225 | -1,601 |
| CaddoTOP CADDO | 3,225 | -1,601 |
| Marble Falls | 3,520 | -1,896 |
| Marble FallsTOP MARBLE FALLS | 3,520 | -1,896 |
| Ranger | 3,685 | -2,061 |
| Top Ranger | 3,685 | -2,061 |
| Duffer | 3,850 | -2,226 |
| DufferTOP DUFFER | 3,850 | -2,226 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,992 | 1,992 | Perforated |
| 3,526 | 3,547 | Perforated |
| 3,582 | 3,586 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 281 | 12.25 | 195 S |
| 4.5 | 3,954 | 7.875 | 270 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 27, 1991 | Apr 19, 1991 | — |
| 00 | Aug 21, 1987 | Aug 12, 1987 | Yes |
| 00 | Aug 18, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-37065 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-37065 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000074936 | W-14 Disposal | Plugged Jan 24, 1992 | 200 | 900 | 1,990–2,020 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13337065, documented in the API reference.