WELL · 42-133-37163 · DISTRICT 7

McKinnerney B.R. Min #6

Y

Eastland County · Eastland County Regular field · Injection  · Vertical

Mckinnerney B.R. Min #6 (API 42-133-37163) is a well in Eastland County operated by Kokomo Energy Inc., completed August 1, 1988 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 16, 1987, permitted to 1,650 ft.

It was permitted by Banner and has since transferred to Kokomo Energy Inc. on the wellbore schedule.

Completion filings report one formation top, including Gardner Sand.

Its lease has reported 6.45K barrels of oil and 70 mcf of gas since January 1993, last reporting in July 2026. The lease carries 15 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 54.5K barrels injected in the 12 months reported through April 2026.

Operator of record

Kokomo Energy Inc.

Permitted by Banner; the EWA schedule now lists a different operator.

Gorman, TX · P-5 Y, filed Apr 4, 2026 · 325 permits on file · (254) 631-6633

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKokomo Energy Inc.
Production reportsKokomo Energy, Inc.through Mar 2024
Latest permitBannerSep 16, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,650
total depth, ft
1
permits on file
Sep 16, 1987
last permit issued
Aug 1, 1988
completed
6.45K
cumulative oil, bbl
70
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 1, 1988
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 15 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McKinnerney, B.R. Min O-8-16427Eastland County RegularKokomo Energy, Inc.156.45K70Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1THB CorporationJan 1993 → Nov 1994
  2. 2Kokomo Energy, Inc.Feb 2013 → Mar 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
335871-99DrillBannerSep 14, 1987Sep 16, 1987—1,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-16427————

Formation tops

As filed on W-2/G-1. Subsea from 1,550 ft elevation.Download CSV →

FormationMD ftSubsea
Gardner Sand1,204346

Perforations

Perforated and open-hole intervals.

FromToType
1,1851,205Perforated
1,1881,196Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,5957.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 7, 1993Mar 5, 1993—
00Jun 11, 1992May 14, 1992—
00Oct 18, 1988Sep 21, 1988—
00Feb 11, 1988Jan 11, 1988Yes
00Feb 10, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

54.5K
bbl, last 12 reported months
159K
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000064575H-1 InjectionActive3505501,185–1,205

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 54,538 · prior 12 8,682(+528%)

02K4K6K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337163, documented in the API reference.