WELL · 42-133-37476 · DISTRICT 7
Maynard #1
Eastland County · Eastland County Regular field · Vertical
Maynard #1 (API 42-133-37476) is a well in Eastland County operated by J & W Oil CO.-W. F., completed February 15, 1991.
The RRC has issued one drilling permit (amended once), issued August 29, 1990, permitted to 3,000 ft.
Completion filings report 2 formation tops, including Marble Falls, Duffer.
No lease production has been reported under this well’s leases.
Operator of record
Eastland, TX · P-5 Y, filed Mar 6, 2020 · 37 permits on file · (254) 631-1838
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J & W Oil Co.-W. F. |
| Production reports | J & W Oil Co.-W. F.through Jul 2003 |
| Latest permit | J & W Oil Co.-W. F.Aug 29, 1990 |
- 3,000
- total depth, ft
- 2
- permits on file
- Aug 29, 1990
- last permit issued
- Feb 15, 1991
- completed
- 0
- cumulative oil, bbl
- 82K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 15, 1991
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Maynard G-8-137584 | Eastland County Regular (Gas) | Texokan Operating, Inc. | 1 | 0 | 82K | Jan 1993 – Jul 2026 |
| — O-8-26102 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1J & W Oil Co.-W. F.Jan 1993 → Jul 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 376671-98 | Field transfer | J & W Oil Co.-W. F. | Mar 27, 1991 | Aug 29, 1990 | — | 3,000 |
| 376671-99 | Drill | J & W Oil Co.-W. F. | Aug 16, 1990 | Aug 29, 1990 | Nov 12, 1990 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-137584 | — | — | — | — |
| — | — O-8-26102 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,408 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 2,602 | -1,194 |
| Duffer | 2,921 | -1,513 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,688 | 2,698 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 156 | 11 | 70 S |
| 4.5 | 2,893 | 7.875 | 160 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 1991 | Apr 1, 1991 | — |
| 00 | Apr 12, 1991 | Feb 21, 1991 | Yes |
| 00 | Apr 9, 1991 | — | — |
| 00 | Mar 6, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-37476 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-37476 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000107360 | H-1 Injection | Canceled Nov 21, 2022 | 400 | 1,300 | 2,616–2,698 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13337476, documented in the API reference.