WELL · 42-133-37557 · DISTRICT 7

Thompson #3

Y

Eastland County · Scranton field · Injection  · Vertical

Thompson #3 (API 42-133-37557) is a well in Eastland County operated by King Energy Resources, completed March 30, 1996 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued May 24, 1991, permitted to 1,900 ft.

It was permitted by PV Oil and has since transferred to King Energy Resources on the wellbore schedule.

Completion filings report 3 formation tops, including Winchell Lime, Winchell Lm, Palo Pinto.

Its lease has reported 8.05K barrels of oil and 78 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 10.5K barrels injected in the 12 months reported through January 2026.

Operator of record

King Energy Resources

Permitted by PV Oil; the EWA schedule now lists a different operator.

Kerrville, TX · P-5 Y, filed Sep 4, 2025 · 4 permits on file · (830) 285-3063

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKing Energy Resources
Production reportsKing Energy Resourcesthrough Apr 2026
Latest permitPV OilMay 24, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,900
total depth, ft
1
permits on file
May 24, 1991
last permit issued
Mar 30, 1996
completed
8.05K
cumulative oil, bbl
78
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 30, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson O-8-25670ScrantonKing Energy Resources38.05K78Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 12 · prior 12 12(+0%)

01202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Guidance Oil Developers, Inc.Jan 1993 → Mar 1993
  2. 2B-W OilApr 1993 → Feb 1997
  3. 3Mist Prod. & Exploration Corp.Mar 1997 → Sep 1997
  4. 4Baxter, Kelly H. Oil and Gas Co.Oct 1997 → Jul 1999
  5. 5King Energy ResourcesOct 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
388202-99DrillPV OilMay 22, 1991May 24, 1991Jun 7, 19911,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-25670————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Winchell Lime1,300
Winchell LM1,300
Palo PintoPALO PINTO LIME1,590
Palo PintoPALO PINTO LM1,590

Perforations

Perforated and open-hole intervals.

FromToType
1,7291,731Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,7826.75265 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 4, 1997Jan 30, 1997—
00Jul 9, 1991Jun 28, 1991Yes
00Jul 8, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

10.5K
bbl, last 12 reported months
208K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000080399H-1 InjectionActive6008001,729–1,731

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 10,500 · prior 12 8,400(+25%)

05001K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337557, documented in the API reference.