WELL · 42-133-37585 · DISTRICT 7

Thomas #1

N

Eastland County · Rainbow Seven (Ranger Sand) field  · Vertical

Thomas #1 (API 42-133-37585) is a well in Eastland County operated by Rainbow Seven Oil & Gas Inc., completed March 14, 1992.

The RRC has issued 2 drilling permits (amended once) between 1991 and 1996, permitted to 4,200 ft.

Completion filings report 7 formation tops, including Marble Falls, Ranger, Duffer, Barnett.

Its 3 leases have reported 1.63K barrels of oil and 58K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Rainbow Seven Oil & Gas Inc.

Ranger, TX · P-5 Y, filed Mar 4, 2026 · 68 permits on file · (254) 631-7848

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRainbow Seven Oil & Gas Inc.
Production reportsBraka Operating, L.L.C.through Apr 2026
Latest permitRainbow Seven Oil & Gas, Inc.Mar 27, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
3
permits on file
Mar 27, 1996
last permit issued
Mar 14, 1992
completed
1.63K
cumulative oil, bbl
58K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 14, 1992
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomas G-8-158656Eastland County Regular (Gas)Braka Operating, L.L.C.1048.3KApr 1996 – Jul 2026
Thomas O-8-26471Eastland County RegularRainbow Seven Oil & Gas, Inc.200Jan 1993 – Apr 1998
Thomas O-8-26564Rainbow Seven (Ranger Sand)Rainbow Seven Oil & Gas, Inc.11.63K9.7KJan 1993 – Jul 1996

Gas, mcf lease total

Last 12 months 9 · prior 12 21(-57%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rainbow Seven Oil & Gas, Inc.Jan 1993 → Apr 2009
  2. 2Braka Operating, L.L.C.May 2009 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446002-99RecompletionRainbow Seven Oil & Gas, Inc.Mar 18, 1996Mar 27, 1996Mar 28, 19964,200
394873-98Field transferRainbow Seven Oil & Gas, Inc.Jun 19, 1992Dec 27, 1991—4,200
394873-99DrillRainbow Seven Oil & Gas, Inc.Dec 20, 1991Dec 27, 1991Jan 25, 19924,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-158656————
—— O-8-26471————
—— O-8-26564————

Formation tops

As filed on W-2/G-1. Subsea from 1,528 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls3,244-1,716
Ranger3,422-1,894
Duffer3,676-2,148
Barnett3,820-2,292
Duffer3,876-2,348
MississippianMISSISSIPPI3,928-2,400
Eelenburger4,070-2,542
Ellenburger4,070-2,542

Perforations

Perforated and open-hole intervals.

FromToType
3,2443,250Perforated
3,4223,444Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520212.25140 S
4.54,2007.875420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 26, 1996Jun 5, 1996Yes
00Jul 5, 1996——
00Aug 10, 1992Jun 3, 1992—
00Jul 6, 1992Mar 23, 1992Yes
00Apr 10, 1992Mar 23, 1992Yes
00Mar 30, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337585, documented in the API reference.