WELL · 42-133-37627 · DISTRICT 7
Franklin A #2
Eastland County · Rainbow Seven (Ranger Sand) field · Vertical
Franklin A #2 (API 42-133-37627) is a plugged well in Eastland County, plugged July 9, 1997, last operated by Rainbow Seven Oil & Gas Inc..
The RRC has issued one drilling permit, issued December 8, 1992, permitted to 4,200 ft.
Completion filings report 2 formation tops, including Marble Falls, Ranger.
Its 2 leases have reported 8.68K barrels of oil and 52.3K mcf of gas since January 1993, last reporting in April 2003. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Ranger, TX · P-5 Y, filed Mar 4, 2026 · 68 permits on file · (254) 631-7848
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rainbow Seven Oil & Gas Inc. |
| Production reports | Rainbow Seven Oil & Gas, Inc.through Aug 2002 |
| Latest permit | Rainbow Seven Oil & Gas, Inc.Dec 8, 1992 |
- 4,200
- total depth, ft
- 1
- permits on file
- Dec 8, 1992
- last permit issued
- Mar 2, 1993
- completed
- 8.68K
- cumulative oil, bbl
- 52.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 2, 1993
- Shut in
- —
- Plugged
- Jul 9, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Franklin O-8-26565 | Rainbow Seven (Ranger Sand) | Rainbow Seven Oil & Gas, Inc. | 3 | 4.18K | 26.2K | Jan 1993 – Apr 2003 |
| Franklin "A" O-8-26837 | Rainbow Seven (Ranger Sand) | Rainbow Seven Oil & Gas, Inc. | 1 | 4.5K | 26.1K | Mar 1993 – Jun 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rainbow Seven Oil & Gas, Inc.Jan 1993 → Aug 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 406750-99 | Drill | Rainbow Seven Oil & Gas, Inc. | Dec 2, 1992 | Dec 8, 1992 | Jan 16, 1993 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-26565 | — | — | — | — |
| — | — O-8-26837 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,525 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 3,236 | -1,711 |
| Ranger | 3,390 | -1,865 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,419 | 3,440 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 205 | 12.25 | 140 S |
| 4.5 | 4,200 | 7.875 | 370 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 7, 1993 | Mar 15, 1993 | Yes |
| 00 | Mar 23, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-37627 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-37627 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.