WELL · 42-133-37761 · DISTRICT 7

Nunnally #3

Y

Eastland County · Blind Hog (Ranger) field · NO Production  · Vertical

Nunnally #3 (API 42-133-37761) is a well in Eastland County operated by Simpson Operating Services LP, completed March 10, 1999 and listed as no production on the RRC schedule.

The RRC has issued one drilling permit, issued December 3, 1998, permitted to 3,700 ft.

It was permitted by Eclipse Oil & Gas, Inc. and has since transferred to Simpson Operating Services LP on the wellbore schedule.

Completion filings report 3 formation tops, including Crosscut, Caddo, Ranger.

Its lease has reported 55.2K barrels of oil and 138K mcf of gas since January 1999, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Simpson Operating Services LP

Permitted by Eclipse Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Ballinger, TX · P-5 Y, filed May 4, 2026 · (325) 365-1521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSimpson Operating Services LP
Production reportsSimpson Operating Services, LPthrough Mar 2026
Latest permitEclipse Oil & Gas, Inc.Dec 3, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,700
total depth, ft
1
permits on file
Dec 3, 1998
last permit issued
Mar 10, 1999
completed
55.2K
cumulative oil, bbl
138K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 10, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nunnally O-8-28595Blind Hog (Ranger)Simpson Operating Services, LP355.2K138KJan 1999 – Jul 2026

Oil, barrels lease total

Last 12 months 19 · prior 12 14(+36%)

0102030202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Eclipse Oil & Gas, Inc.Jan 1999 → Dec 2001
  2. 2Mineral Technologies, Inc.Jan 2002 → Feb 2015
  3. 3TCF Energy, Inc.Jul 2002 → Dec 2004
  4. 4Noramco Production, LLCMay 2015 → Sep 2020
  5. 5Otex LLCFeb 2021 → Feb 2022
  6. 6Simpson Operating Services, LPMar 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481172-99DrillEclipse Oil & Gas, Inc.Nov 30, 1998Dec 3, 1998Dec 21, 19983,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28595————

Formation tops

As filed on W-2/G-1. Subsea from 1,671 ft elevation.Download CSV →

FormationMD ftSubsea
Crosscut1,322349
Caddo2,394-723
Ranger2,922-1,251

Perforations

Perforated and open-hole intervals.

FromToType
2,9222,968Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62514712.25100 S
5.53,5387.875570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 17, 1999Mar 31, 1999Yes
00Apr 29, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337761, documented in the API reference.