WELL · 42-133-37773 · DISTRICT 7
Bannowsky #2
Eastland County · Eastland County Regular (Gas) field · Vertical
Bannowsky #2 (API 42-133-37773) is a plugged well in Eastland County, plugged September 23, 2003, last operated by Interstate Explorations LLC.
The RRC has issued one drilling permit (amended once), issued May 5, 1999, permitted to 2,000 ft.
Completion filings report one formation top, including Tannehill.
Operator of record
Houston, TX · P-5 Y, filed Feb 4, 2026 · 129 permits on file · (254) 442-1057
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Interstate Explorations LLC |
| Production reports | Interstate Explorations LLCthrough May 2003 |
| Latest permit | Interstate Explorations LLCMay 5, 1999 |
- 2,000
- total depth, ft
- 2
- permits on file
- May 5, 1999
- last permit issued
- Apr 15, 2000
- completed
- 0
- cumulative oil, bbl
- 1.07K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2000 THROUGH Sep 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 15, 2000
- Shut in
- —
- Plugged
- Sep 23, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bannowsky G-8-178508 | Eastland County Regular (Gas) | Interstate Explorations LLC | 1 | 0 | 1.07K | Apr 2000 – Sep 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Interstate Explorations LLCMar 2002 → May 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 484321-98 | Drill | Interstate Explorations LLC | Jun 16, 2000 | May 5, 1999 | May 6, 1999 | 1,488 |
| 484321-99 | Drill | Big State Industries, Inc. | May 5, 1999 | May 5, 1999 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-178508 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,735 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 198 | 1,537 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 224 | 226 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 285 | 6.75 | 70 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 2000 | Jul 5, 2000 | Yes |
| 00 | Sep 14, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-37773 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-37773 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13337773, documented in the API reference.