WELL · 42-133-37824 · DISTRICT 7

Eberhart Ranch #2

N

Eastland County · Penn (Caddo) field  · Vertical

Eberhart Ranch #2 (API 42-133-37824) is a well in Eastland County operated by Wejco Inc., completed April 29, 2002.

The RRC has issued 2 drilling permits (amended once) between 2002 and 2012, permitted to 3,654 ft.

Completion filings report 2 formation tops, including Caddo, Duffer.

Its 2 leases have reported 143K barrels of oil and 1.14M mcf of gas since May 2002, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 6.81K barrels injected in the 12 months reported through April 2026.

Operator of record

Wejco Inc.

Rising Star, TX · P-5 Y, filed Sep 4, 2025 · 17 permits on file · (254) 643-3004

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWejco Inc.
Production reportsWejco, Inc.through Apr 2026
Latest permitWejco, Inc.Aug 3, 2012
3,654
total depth, ft
3
permits on file
Aug 3, 2012
last permit issued
Apr 29, 2002
completed
143K
cumulative oil, bbl
1.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 29, 2002
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Eberhart Ranch O-8-29376Bill Edwards (Duffer)Wejco, Inc.4140K1.13MMar 2004 – Jul 2026
Eberhart Ranch O-8-29150Penn (Caddo)Wejco, Inc.13.94K5.61KMay 2002 – Jan 2013

Oil, barrels lease total

Last 12 months 1,580 · prior 12 2,045(-23%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 7,108 · prior 12 9,976(-29%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1King Operating CorporationMay 2002 → Jan 2012
  2. 2Wejco, Inc.Aug 2004 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
743492-99RecompletionWejco, Inc.Jun 25, 2012Aug 3, 2012Jul 27, 20123,654
517575-98DrillKing Operating CorporationMay 28, 2002Feb 13, 2002Feb 27, 20023,600
517575-99DrillKing Operating CorporationFeb 13, 2002Feb 13, 2002—3,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-29150————
—— O-8-29376————

Formation tops

As filed on W-2/G-1. Subsea from 1,587 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo2,590-1,003
Duffer3,332-1,745

Perforations

Perforated and open-hole intervals.

FromToType
2,5922,735Perforated
2,5962,620Perforated
3,3323,342Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540212.25250 S
5.53,6547.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 2014Oct 28, 2013—
00Jan 11, 2013Aug 6, 2012—
00Aug 13, 2002Jun 3, 2002Yes
00Jul 25, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6.81K
bbl, last 12 reported months
80K
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108123H-1 InjectionActive7501,2952,590–3,654

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,805 · prior 12 6,950(-2%)

05001K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337824, documented in the API reference.