WELL · 42-133-37825 · DISTRICT 7
Eberhart Ranch #3
Eastland County · Bill Edwards (Duffer) field · Vertical
Eberhart Ranch #3 (API 42-133-37825) is a plugged well in Eastland County, plugged October 8, 2003, last operated by Wejco Inc..
The RRC has issued one drilling permit, issued March 7, 2002, permitted to 3,600 ft.
It was permitted by King Operating Corporation and has since transferred to Wejco Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Duffer, Barnett.
Its lease has reported 16.1K barrels of oil and 394K mcf of gas since January 2002, last reporting in December 2012. The lease carries 7 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by King Operating Corporation; the EWA schedule now lists a different operator.
Rising Star, TX · P-5 Y, filed Sep 4, 2025 · 17 permits on file · (254) 643-3004
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wejco Inc. |
| Production reports | Wejco, Inc.through Feb 2004 |
| Latest permit | King Operating CorporationMar 7, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,600
- total depth, ft
- 1
- permits on file
- Mar 7, 2002
- last permit issued
- Apr 11, 2002
- completed
- 16.1K
- cumulative oil, bbl
- 394K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Dec 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 11, 2002
- Shut in
- —
- Plugged
- Oct 8, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eberhart Ranch O-8-29105 | Bill Edwards (Duffer) | Wejco, Inc. | 7 | 16.1K | 394K | Jan 2002 – Dec 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1King Operating CorporationJan 2002 → Dec 2003
- 2Wejco, Inc.Jan 2004 → Feb 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 518155-99 | Drill | King Operating Corporation | Mar 7, 2002 | Mar 7, 2002 | Mar 8, 2002 | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29105 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,600 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,388 | 3,446 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 402 | 12.25 | 250 S |
| 5.5 | 3,600 | 7.875 | 285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 19, 2002 | Apr 25, 2002 | Yes |
| 00 | May 14, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-37825 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-37825 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13337825, documented in the API reference.