WELL · 42-133-37828 · DISTRICT 7

Eberhart Ranch #5H

N

Eastland County  · Horizontal

Eberhart Ranch #5H (API 42-133-37828) is a permitted horizontal well in Eastland County filed by Wejco, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 2002 and 2013, permitted to 3,999 ft.

Completion filings report one formation top, including Duffer.

Its 2 leases have reported 18.9K barrels of oil and 397K mcf of gas since January 2002, last reporting in May 2018. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Wejco, Inc.

Rising Star, TX · P-5 Y, filed Sep 4, 2025 · 17 permits on file · (254) 643-3004

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsWejco, Inc.through Sep 2016
Latest permitWejco, Inc.Jul 26, 2013
3,999
total depth, ft
2
permits on file
Jul 26, 2013
last permit issued
—
completed
18.9K
cumulative oil, bbl
397K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH May 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Eberhart Ranch -E- O-8-29377Bill Edwards (Duffer)Wejco, Inc.12.86K2.68KMar 2004 – May 2018
Eberhart Ranch O-8-29105Bill Edwards (Duffer)Wejco, Inc.716.1K394KJan 2002 – Dec 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1King Operating CorporationJan 2002 → Dec 2003
  2. 2Wejco, Inc.Jan 2004 → Sep 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
766966-99RecompletionWejco, Inc.Jul 24, 2013Jul 26, 2013—3,999
519722-99DrillKing Operating CorporationMay 6, 2002May 6, 2002May 7, 20023,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-29105————
—— O-8-29377————

Formation tops

As filed on W-2/G-1. Subsea from 1,602 ft elevation.Download CSV →

FormationMD ftSubsea
Duffer3,429-1,827

Perforations

Perforated and open-hole intervals.

FromToType
3,4293,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540812.25250 S
5.53,6007.875410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 16, 2004Jul 29, 2002Yes
00Sep 25, 2002Jul 29, 2002Yes
00Sep 4, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13337828, documented in the API reference.