WELL · 42-133-37842 · DISTRICT 7
Eberhart C #10
Eastland County · Eberhart Ranch (Caddo) field · Vertical
Eberhart C #10 (API 42-133-37842) is a plugged well in Eastland County, plugged July 24, 2017, last operated by Wejco Inc..
The RRC has issued 2 drilling permits between 2002 and 2004, permitted to 3,650 ft.
Completion filings report 3 formation tops, including Caddo, Marble Falls, Ennenberger.
Its 2 leases have reported 5.86K barrels of oil and 65.9K mcf of gas since November 2002, last reporting in April 2018. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Rising Star, TX · P-5 Y, filed Sep 4, 2025 · 17 permits on file · (254) 643-3004
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wejco Inc. |
| Production reports | Wejco, Inc.through Jan 2017 |
| Latest permit | Wejco, Inc.Jun 16, 2004 |
- 3,650
- total depth, ft
- 2
- permits on file
- Jun 16, 2004
- last permit issued
- May 11, 2004
- completed
- 5.86K
- cumulative oil, bbl
- 65.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2002 THROUGH Apr 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 11, 2004
- Shut in
- —
- Plugged
- Jul 24, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eberhart "C" O-8-29407 | Eberhart Ranch (Caddo) | Wejco, Inc. | 1 | 5.86K | 65.9K | May 2004 – Apr 2018 |
| Eberhart "C" O-8-29223 | Bill Edwards (Duffer) | Wejco, Inc. | 1 | 0 | 0 | Nov 2002 – Jul 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wejco, Inc.May 2004 → Oct 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 546743-99 | Recompletion | Wejco, Inc. | Jun 10, 2004 | Jun 16, 2004 | Apr 27, 2004 | 3,580 |
| 525562-99 | Drill | King Operating Corporation | Nov 15, 2002 | Nov 15, 2002 | Nov 10, 2002 | 3,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29223 | — | — | — | — |
| — | — O-8-29407 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,610 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 2,570 | -960 |
| Marble Falls | 2,860 | -1,250 |
| Ennenberger | 3,550 | -1,940 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,584 | 2,604 | Perforated |
| 2,636 | 2,652 | Perforated |
| 2,655 | 2,662 | Perforated |
| 2,692 | 2,699 | Perforated |
| 2,704 | 2,714 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 386 | 12.25 | 250 S |
| 5.5 | 3,580 | 7.875 | 670 S |
| 5.5 | 3,580 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 10, 2004 | Jun 1, 2004 | Yes |
| 00 | Jul 8, 2004 | — | — |
| 00 | May 14, 2003 | Mar 14, 2003 | Yes |
| 00 | Apr 28, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-133-37842 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-133-37842 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.